Similar Projects
Oak Hill Tank Replacement - City Of Petaluma -
New Construction, Demolition, Infrastructure
Conception
$4,000,000 est. value
Petaluma, CA

Storage Tank Cleaning And Coating - WT26UT01 - City of Napa
Term Contract
Conception
$450,000 est. value
Napa, CA

La Cresta Tank Replacement - C67402122 - City Of Petaluma
New Construction, Infrastructure
Design
$2,000,000 est. value
Petaluma, CA 94952

Sunnyvale Cleanwater Program Secondary Treatment and Dewatering and Sunnyvale Cleanwater Program Existing Plan Rehabilation Project
Infrastructure
Bidding
$250,000,000 est. value
Sunnyvale, CA

Alco Park Utility Storage Tank Removal Project
Alteration
Bidding
$250,000 est. value
Oakland, CA 94612

USCG Novato Demolish Water Tower and Building 125 Pump House
Demolition
Post-Bid
$250,000 to $500,000 est. value
Novato, CA

Tanks, Sumps and Accessories
Infrastructure
Post-Bid
West Sacramento, CA

Skyline Water Tank Replacement Project
Infrastructure
Results
Millbrae, CA 94030

Aboveground and Underground Storage Tanks Monitoring, Maintenance, Testing, and Repair Services
Term Contract
Results
Less than $500,000 est. value
Redwood City, CA 94063

Storage Tank Cleaning And Coating - WT24UT02 - City of Napa
Infrastructure
Conception
$450,000 est. value
Napa, CA 94558

SCWP - Secondary Treatment and Thickening/Dewatering - CAS Stage 1
Infrastructure
Bidding
$250,000,000 est. value
Sunnyvale, CA 94089

Kern County Sheriff Lerdo Water Tank Replacement
Infrastructure
Post-Bid
Bakersfield, CA 93308

FWTP Backwash Tank Interior Cleaning
Term Contract
Results
$450,000 est. value
Sacramento, CA

Storage Tank Cleaning And Coating - WT25UT01 - City of Napa
Infrastructure
Conception
$450,000 est. value
Napa, CA 94558

Randall-Bold Water Treatment Plant Chemical Storage Improvements, Phase 2
Renovation
Bidding
$1,548,200 est. value
Oakley, CA 94561

Reported 06/23/2022 02:21 PM
Project Title

Stow Tanks 1-4 Repairs and Recoat - CP76300028 - City of Simi Valley

Physical Address View project details and contacts
City, State (County) Simi Valley, CA   (Ventura County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2024
Bids Due View project details and contacts
Estimated Value $3,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and renovation of a water / sewer project in Simi Valley, California. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project. This project would repair and upgrade three of the four Stow Tanks that have been in service since 1960, with a total capacity of 5 Million gallons.The Waterworks Facilities Assessment conducted by Carollo Engineers in 2015, recommended revising the site layout, realigning the piping, and/or a combination of each to install a flexible pipe connection with a full range of differential movement for Tank No. 1. All tanks will have the voids below the tank perimeter, filled with a flowable material to reinforce the structure. Bollards will be installed to protect the tank inlet/outlet piping. The wall base around the tanks will be provided with localized blasting and recoating. The base will then be resealed with a flexible joint sealant. In addition, the Seismic Evaluation of the Waterworks Storage Tank System, conducted by Kennedy Jenks Consultants in 2020, identified that the strength of the shell is deficient, the column supports need to be replaced, the tank needs to be anchored, and a ring wall foundation needs to be constructed to support the structure to meet current seismic requirements. In addition, tank interiors needed to be recoated and exterior needs to be painted. Staff recommends to replace Stow Tank No.1 with a new welded steel tank and retrofit and repair Tank Nos. 2, 3, and 4 to meet the current seismic code requirements to ensure reliability of the system. Design is anticipated to be completed in May 2024 and construction is expected to be completed by October 2025. Project is included in the City of Simi Valley's FY 2022 - 2027 CIP. As of June 22, 2022, information regarding a design team and a general contractor is not available. Construction is anticipated in FY 2024 and FY 2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents