Similar Projects
Draper Prison Demolition
Demolition, Infrastructure
Sub-Bidding
$14,000,000 CJ est. value
Draper, UT 84020

Taylor Canyon Elementary Building Demolition
Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Ogden, UT 84401

Removal of Asbestos Containing Pipe Insulation and Debris
Post-Bid
Helper, Price, UT 84526

Asbestos Abatement Contractors for the Demolition and Removal of Two Natural Gas Steam Boilers
Post-Bid
Logan, UT

Asbestos Abatement Horace Mann Elementary School
Results
Ogden, UT 84404

CDBG PY21 FY22 Clearance 100 West
Term Contract
Results
Saint George, UT 84770

Hill AFB Base Integrated Environmental Support Tasks (Biest)
Term Contract
Post-Bid
Hill AFB, UT

Asbestos Abatement and Related Services Contract
Term Contract
Results
Farmington, UT

Environmental Testing
Term Contract
Post-Bid
Hill AFB, UT

Homeless Camp Abatement
Alteration
Results
$400,000 est. value
Salt Lake City, UT

Meth and Mold Remediation Services
Term Contract
Post-Bid
Fort Duchesne, UT

DFCM Construction-William Stewart Applied Science Building Preconstruction HazMat Abatement
Alteration
Results
$350,000 est. value
Salt Lake City, UT 84112

Cultural and Environmental MATOC
Term Contract
Post-Bid

Wasatch Front Phase 1 Project Reclamation Construction
Infrastructure
Results
$177,800 CJ est. value
Salt Lake City, UT 84124

Abatement of Asbestos Fire Doors, Vinyl Tile and Mastic, TSI, Ceiling Tile, Roofing, Sheetrock, HVAC Sealant
Alteration
Post-Bid
Ferron, UT 84523

Last Updated 08/03/2022 11:07 PM
Project Title

DFCM Construction- Utah Department of Corrections Draper Prison Site Hazardous Materials Abatement

Physical Address View project details and contacts
City, State (County) Draper, UT 84020   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all required and necessary tools, equipment, PPE for the removal of regulated and non-regulated asbestos-containing building material and universal wastes as a condition of building demolition as detailed in the abatement project scope of work and individual survey and assessments for each building. Construction Cost Estimate: Work Group 1: $1,250,000.00 Work Group 2: $3,350,000.00 Work Group 3: $2,800,000.00 Work Group 4: $1,600,000.00 Total Construction Cost Estimate: $9,000,000.00

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents