Similar Projects
Last Updated | 03/28/2022 07:14 AM |
Project Title | Improvements to Independence Park |
Physical Address | View project details and contacts |
City, State (County) | Riverdale, NJ (Morris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed project is for the construction of a walking path behind both baseball fields at Independence Park. To create the space needed for a ten (10) foot wide walking path the project calls for an approximately 500-foot-long geogrid reinforced, segmental retaining wall with a range of heights from 2`-4" to 13`-8". The scope of work includes, but is not limited to: demolition of the existing railroad tie walls throughout the work area, removal of 1,300 CY of native soil, the construction of an up to 5,000 SF Keystone Compac Victorian, geogrid reinforced, segmental retaining wall, or approved equal, construction of an approximately 600 SY porous pavement walking path, installation 550 LF of perforated drainage pipe within the walkway, installation of 525 LF of 4 foot tall PVC-coated chain-link fence, installation of 80 LF of 6 foot tall decorative aluminum fencing in sleeve-its and timber vehicular guardrail, and soil stabilization with top soil, seed, salt hay, and jute netting over a 2,600 SY area. |
||||||||
Details | Park/Playground, Renovation.
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |