Similar Projects
Reported | 03/26/2020 12:00 AM |
Project Title | Stoney Point Elementary Loop Pump Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28302 (Cumberland County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall install taco pump supplied by CCS. The contractor shall replace all piping from the gate valve to the pump with new components as shown in the drawing. The contractor shall supply all new bolts, gaskets, flanges, suction diffuser, lex connectors, valves, piping and gauges. The contractor shall be responsible for the pipe fitment, welding, alignment (including pump to motor alignment) . The contractor shall reinsulate the piping with new insulation of the same R value. The contractor shall install the pump according to manufacturer specifications. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |