Similar Projects
Tribal Transit Service Building
New Construction - 5,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lac du Flambeau, WI 54538

Commercial Storage Facility
New Construction - 34,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Sister Bay, WI 54234

Kwik Trip
New Construction
Design
Sheboygan, WI

Stone Horse Green
New Construction
Bidding
$1,600,000 est. value
Middleton, WI 53562

Cold Storage Shed
New Construction
Post-Bid
Richland Center, WI 53581

Sheriff's Office Storage Building
New Construction
Post-Bid
Lake Mills, WI 53551

Pole Barn Insulation
Results
Pewaukee, WI 53072

2020 Sludge Storage Building
Results
Wisconsin Rapids, WI 54495

Circle K - Ledgeview
New Construction - 12,733 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
De Pere, WI 54115

Lou Perrine's Convenience Store
New Construction, Renovation
Construction
Kenosha, WI 53143

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Multi-Tenant Commercial Building - Storage Units
New Construction - 46,080 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Caledonia, WI

Pre-Engineered Metal Buildings
New Construction
Post-Bid
New Berlin, WI 53151

Sand / Salt Shed
Results
Plum City, WI 54560

Reported 12/16/2021 12:00 AM
Project Title

Eau Claire County Highway Maintenance Facility-Bid Package 1

Physical Address View project details and contacts
City, State (County) Eau Claire, WI   (Chippewa County)
Category(s) Commercial
Sub-Category(s) Gas Station, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

BP #1 includes: Pre-Cast Concrete, Structural Steel Supply, Pre-Engineered Building, Salt Storage Building and the Fueling Island.In general the project consists of a new 133,000 SF Highway Maintenance Building, a 30,000 SF Cold Storage Building, a 20,000 ton capacity salt storage building, and a Fueling Island. The Maintenance Building is generally of structural pre-cast concrete with steel bar joist and deck roof system. The Cold Storage Building is to be a pre-engineered metal building on concrete foundation. The Salt Storage Building is primarily wood frame and concrete foundation.

Details

163,000 SF - Warehouse/Storage, 30,000 SF New Construction, 133,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents