Similar Projects
Sanbornton Public Library Roof
Bidding
Sanbornton, NH 03269

Everett Arena Partial Roofing Replacement Project
Bidding
Concord, NH 03301

Roofing Projects 2020
Term Contract
Post-Bid
Littleton, NH 03561

Tamworth School District Roofing Project
Post-Bid
Tamworth, NH 03886

Headquarters Roofing Project
Results
Less than $243,785 est. value
Concord, NH 03301

Roof Repairs
Results
Brentwood, NH

Visitor Center Roof
Bidding
Bethlehem, NH 03574

Roofing MACC
Post-Bid

Flat Roofs at JRMS and RMS
Results
Jaffrey, NH

2021 District Court Roof Replacement
Bidding
Hooksett, NH

Roofing Repair and Maintenance
Post-Bid

Roofing Replacement Bear Hill Area at Bear Brook State Park
Results
Allenstown, NH 03275

Access Center Roof
Bidding
Londonderry, NH 03053

Repair/Replace Gutters Portsmouth Nh
Results
$25,000 est. value
Portsmouth, NH 03801

DPW Garage Roof
Bidding
Londonderry, NH 03053

Last Updated 11/25/2019 10:04 AM
Project Title

Henniker Fire Department (HFD) Roof Replacement - New Shingle Installation

Physical Address View project details and contacts
City, State (County) Henniker, NH 03242   (Merrimack County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete roof replacement, new shingle installation, for the Henniker Fire Department building, 216 Maple Street, Henniker NH, Spring/Summer 2020. 1. Remove existing roof to roof deck. Make any roof deck repairs needed or plywood replacement, etc. (if needed). This to be time and materials. 2. Install new heavy, 024gauge custom bent baked or enamel T-type drip edge around all perimeter edges. Color to be chosen by fire dept. 3. Install 9ft. of Grace snow and ice shield on all bottom edges and each side of all roof valleys. 3ft. around all roof penetrations (must be Grace). 4. Install new Roof Guard underlayment on balance of roof deck. Or equivalent. 5. Install new 50 year Certainteed Landmark Series architectural shingles to manufacturer’s specs. Please price standard Landmark and price for Pro Series Landmark. Color to be chosen by fire dept. 6. All shingle valleys to be a cut valley system. 7. Flash all vent pipes to manufacturer’s specs. with new pipe flashing. 8. Flash cupola side walls to manufacturer’s specs. with matching baked on enamel custom flashing. 9. Install new Certainteed Shingle Vent II ridge vent at all peaks. 10. Install new matching Hip and Ridge cap shingles. 11. Clean up and removal of all roofing debris on a daily basis (this is a must). 12. All safety rules apply while doing roof replacement. This is contractor’s responsibility.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents