Similar Projects
Last Updated | 11/14/2022 06:31 AM |
Project Title | RFQ Design - Connecting Several Buildings to the Colleges Centralized Chiller Plant |
Physical Address | View project details and contacts |
City, State (County) | Marianna, FL 32446 (Jackson County) |
Category(s) | Education, Government/Public |
Sub-Category(s) | College/University, Library - Public |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $7,776,582 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Chipola College is requesting proposals for architectural services needed for construction, renovation, and remoldeling associated with connecting several buildings to the Colleges centralized chiller plant. At a minimum, architectural services needed will include development of design documents and the coordination of other professional design services (e.g. mechanical, electrical, etc.) as necessary. The College desires to select an architectural firm for professional services in accordance with Section 287.055 (2)(g), Florida Statutes. Upon execution of a contract with the College, the selected Architect will be eligible to provide professional architectural consulting services. Tasks may include but are not limited to architectural design services, including development of design documents. In addition, the selected architect will be expected to oversee and coordinate with other design professionals (g.e. mechanical, electrical, etc.) for the construction, renovation, and remodeling associated with connecting several College buildings to the Colleges centralized chiller plant. Based on the nature of the project, it is anticipated that a significant amount of design work will have to be performed by mechanical and electrical engineers working under the direction of the architectural firm chosen. It is further expected that some of the buildings will require extensive changes to accommodate new cooling and heating systems. The College reserves the right to accept or reject proposals in whole or in part, and to award proposals in the manner the College determines to be in its best interest. The method of contractor selection has not been determined at this time. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |