Similar Projects
Breckwood Pond Dam - Repair - City of Springfield
Infrastructure
Conception
$1,500,000 CJ est. value
Springfield, MA 01109

Upper Van Horn Dam Phase 2 - City of Springfield
Infrastructure
Conception
$2,000,000 CJ est. value
Springfield, MA 01103

Water and Drainage Infrastructure on Meadow Street
Infrastructure
Bidding
$5,590,000 CJ est. value
Agawam, MA 01001

Holyoke Water Works, Whiting Street Reservoir Dam Improvements Project
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Holyoke, MA 01040

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Telemetry Devices for Automated Meter Infrastructure
Infrastructure
Post-Bid
Agawam, MA

World-Wide Water Storage Tank Remediation
Term Contract
Results

Furnishing of Water Meters and Appurtenances on an As Needed Basis
Term Contract
Results
Agawam, MA

Construction, Reconstruction, and Repair of Vaults, Penstocks
Alteration
Post-Bid
Holyoke, MA

Resiliency Improvements at Watershops Pond Dam
Infrastructure
Results
$1,600,000 est. value
Springfield, MA

Roger Reed Fish Hatchery Upper Dam Repairs and Pipeline Replacement
Infrastructure
Post-Bid
$646,000 est. value
Palmer, MA 01069

Furnish Water, Sewer, and Drain Materials
Term Contract
Results
Agawam, MA

Underground Storage Tank Removal at Blueberry Hill School and Wolf Swamp Road School
Infrastructure
Results
$40,000 est. value
Longmeadow, MA 01106

Cooley and Avery Water Main Replacement Project
Infrastructure
Results
$660,000 est. value
East Longmeadow, MA

Ridge and East Circle Water Main Replacement Project
Infrastructure
Results
$1,100,000 est. value
East Longmeadow, MA

Last Updated 09/21/2022 10:01 AM
Project Title

RFP - Professional Engineering Services

Physical Address View project details and contacts
City, State (County) Agawam, MA 01001   (Hampden County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2020
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Springfield Water and Sewer Commission is seeking multi-disciplined engineering consulting firms to provide professional engineering services. The Commission intends to contract with at least two firms. The scope of work includes: water treatment optimization, dam engineering and inspections, water transmission system investigations, large water distribution systems evaluations, concrete water tank evaluations, and SCADA Systems programming, troubleshooting, integration, and reporting. The method of Contractor Selection has not been Determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents