Similar Projects
USH 14 - Re/Reconditioning / Mill and Overlay
Infrastructure
Conception
$1,000,000 est. value
Evansville, WI 53536

North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Asphalt Milling/Pulverizing
Infrastructure
Post-Bid
WI

Traxler Parking Lot Improvements
Infrastructure
Post-Bid
Janesville, WI

2021 Crack Sealing
Infrastructure
Results
Beloit, WI

2022 Street and Utility Improvements
Infrastructure
Results
Orfordville, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

Bergen - Emerald Grove RR OPS/ Crossing Repair/ Resurface
Infrastructure
Design
$250,000 CJ est. value
Clinton, WI 53525

Paving East Stateline Road from Dry Creek East to Freechurch Road
Infrastructure
Post-Bid
$300,000 est. value
WI

Last Updated 05/25/2023 02:40 PM
Project Title

2023 HMA Preventative Maintenance

Physical Address View project details and contacts
City, State (County) Milton, WI 53563   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $63,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed base bid consists of preparation, crack sealing, chip sealing, and other miscellaneous items of work on approximately 10,000 lineal feet of roadway and parking areas. The proposed alternate bids consist of crack sealing work on approximately 12,000 lineal feet of roadway and parking areas. Direct all questions about the meaning or intent of the Contract Documents to the Public Works Director (Telephone 608-868-6921, or email mlanger@milton-wi.gov.com). Interpretations or clarifications considered necessary by the Public Works Director in response to such questions will be issued by Addendum emailed by the Owner's designated independent distributor, to all parties recorded as having received the Bidding Documents. Questions received less than five (5) business days prior to the Bid Opening, might not be answered. Question Deadline 05/18/2023

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents