Similar Projects
2024 Crack Sealing of MSA Streets
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Brooklyn Park, MN 55443

RAC Site Prep
Infrastructure
Post-Bid
$425,000 CJ est. value
Hassan Township, MN 55374

Repair Interior Multiple Buildings
Renovation
Post-Bid
$500,000 CJ est. value
Saint Paul, MN 55111

2022 Random Concrete Repairs
Infrastructure, Alteration
Results
Saint Louis Park, MN

Public Safety Facility Shower Refurbishment
Renovation
Results
$759,000 CJ est. value
Minneapolis, MN 55415

Folwell and 46th Ave. S. ADA Pedestrian Ramp Program - ReBid
Infrastructure
Post-Bid
$1,637,022 CJ est. value
Minneapolis, MN 55406

Grading, Bituminous Surfacing, ADA Improvements, Lighting, TMS, and Bridge No 27317
Infrastructure
Results
$5,041,809 CJ est. value
Plymouth, MN 55441

Normandale Hills Elementary School Mechanical Improvements
Renovation
Post-Bid
$10,750,000 CJ est. value
Minneapolis, MN 55437

Bridge No. 27J78 Replacement on Trailhaven Road
Demolition, New Construction, Infrastructure
Results
$194,601 CJ est. value
Corcoran, MN 55340

PW-Ready Mix Concrete
Term Contract
Post-Bid
Minneapolis, MN 55415

Water Treatment Plant No. 15 2023 Improvements Project
Infrastructure, Renovation
Results
$218,929 CJ est. value
Minnetonka, MN 55345

Maple Grove Middle School Park Trail Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Maple Grove, MN 55369

Pioneer Trail Reconstruction
Infrastructure
Results
$1,377,815 CJ est. value
Eden Prairie, MN 55345

District Court IT Relocation
Renovation
Post-Bid
$400,000 CJ est. value
Minneapolis, MN 55487

2023 Bituminous Mill & Overlay
Infrastructure
Results
$322,283 CJ est. value
Wayzata, MN 55391

Last Updated 02/14/2024 09:41 AM
Project Title

Maple Avenue & Sugar Lane Mill & Overlay

Physical Address View project details and contacts
City, State (County) Rogers, MN 55374   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $191,642 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 5, 2023 , this project has not yet been awarded. The project is expected to be awarded on July 5, 2023. The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 6,661 S Y Mill Bituminous Surface 515 L F Remove and Replace Concrete Curb & Gutter 687 TON Type SP 9.5 Wearing Course Mix (2,B) 2 EA Construct Drainage Structure The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days A pre-bid conference will not be conducted for this Project Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Jenn Edison, Project Manager, at 612.219.3500 and jedison@wsbeng.com. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The furnishing of all labor, materials, tools, and equipment necessary to complete the street construction and appurtenant work as shown on the Plans and detailed in the Specifications.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents