Similar Projects
Garage and Trailer Component Factory
New Construction
Pending Verification
Big Lake, MN

Tri-Ven Facility
Addition, Infrastructure - 50,000 SF
Conception
Baxter, MN 56425

Gateway Interstate
New Construction - 250,000 SF
Construction
Arden Hills, MN 55112

4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Conception
Oakdale, MN

Quality One Woodwork Expansion
Addition - 50,000 SF
Pending Verification
Hastings, MN 55033

Daikin Control Room Heat Transfer Test Cell
Renovation
Post-Bid
Minneapolis, MN 55441

River Valley Industrial Development
New Construction - 84,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Chaska, MN 55318

Graco, Inc
New Construction - 500,000 SF
Construction
$10,000,000 CJ est. value
Dayton, MN 55327

Mickelson Invesments Building
New Construction - 12,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clearwater, MN

Advanced Volumetric Alliance Factory
New Construction, Infrastructure - 180,000 SF
Construction
$10,000,000 CJ est. value
Albertville, MN

Land O Lakes Melrose Milk Receiving Addition and Renovation
Renovation
Bidding
Melrose, MN 56352

Huber Engineered Woods Processing Plant
New Construction
Pending Verification
$440,000,000 est. value
Cohasset, MN

Last Updated 01/28/2022 03:40 PM
Project Title

Nordic Ware Manufacturing Warehouse

Physical Address View project details and contacts
City, State (County) Saint Louis Park, MN 55416   (Hennepin County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Construction Commenced May 2021, Construction Complete as of December 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Addition to include new loading dock, new parking lot and landscaping improvements

Details

45,000 SF - Manufacturing/Processing Plant, 45,000 SF Addition, Manufacturing/Processing Plant, 45,000 SF Addition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents