Similar Projects
Maclean Hall Major Renovation
Renovation - 79,634 SF
Conception
$27,900,000 est. value
Iowa City, IA 52240

New Womens Gymnastics Spirit Squad Training Center
New Construction - 30,000 SF
Conception
$7,000,000 to $9,000,000 est. value
Iowa City, IA

Iowa Wrestling Training Facility
New Construction - 37,000 SF
Bidding
$17,200,000 est. value
Iowa City, IA 52242

Lake Mills Community School District - Bus Garage
New Construction - 16,800 SF
Bidding
$2,200,000 est. value
Lake Mills, IA 50450

HCC Brock Student Center Bookstore
Post-Bid
Waterloo, IA 50701

Southeast Iowa Regional Planning Commission - Bus Storage Facility
New Construction
Post-Bid
West Burlington, IA

Kirkwood Animal Health Building
New Construction
Results
Cedar Rapids, IA

Kingston Maintenance Shop
New Construction
Results
Less than $1,373,375 est. value
Cedar Rapids, IA

Grundy Hall
Renovation, Addition - 78,000 SF
Construction
Waterloo, IA 50701

West Des Moines Campus
New Construction - 320,000 SF
Construction
$50,000,000 est. value
Des Moines, IA 50312

University Avenue Storage Expansion
New Construction
Pending Verification
Des Moines, IA 50316

Office Warehouse Building
New Construction - 9,600 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Waukee, IA

Iowa Memorial Union - Install Show Dorm Room
Renovation
Bidding
$110,000 est. value
Iowa City, IA 52245

Marion High School Activities Complex
New Construction
Post-Bid
Marion, IA 52302

Road Department Equipment Storage Facility at Ventura and Thornton
New Construction
Results
Thornton, Ventura, IA 50482

Last Updated 05/17/2022 03:40 AM
Project Title

Equine Learning Center-Hay Storage Shed-Replacement

Physical Address View project details and contacts
City, State (County) Ames, IA 50014   (Story County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $56,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new pole building at the Equine Learning Center. The project includes, but is not limited to, design, engineering, and construction of the structure. The following will be performed by others; site grading including import of soils, installation of culvert, placement and compaction of gravel drive and building pad, topsoil placement and finish grading, and site seeding. Refer to the Drawings for complete scope of Work.

Details

Warehouse/Storage, Renovation, College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents