Similar Projects
RFQ Engineering - UWMIL Central Heating Plant Chiller Replacement
Alteration
Conception
$13,360,000 est. value
Milwaukee, WI

Beach Drive Shoreline Repairs Project
Infrastructure
Bidding
$300,000 CJ est. value
Fox Point, WI 53217

Restoration of Vacant Lots to a Dust Free Erosion Free Condition
Infrastructure
Bidding
$50,000 est. value
Milwaukee, WI

Appliances
Term Contract
Sub-Bidding
Milwaukee, WI 53202

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

F105--Emerald Ash Bore Tree Treatment
Term Contract
Post-Bid
Milwaukee, WI 53295

Parking Lot
Results
Milwaukee, WI 53205

Sidewalk High Impact Paving Work
Results
Milwaukee, WI

Habitat for Humanity ReStore
Addition, Infrastructure - 27,078 SF
Pending Verification
Wauwatosa, WI 53222

Brown Deer Public Library Parking Lot Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Brown Deer, WI 53223

Area Wide Sidewalk Replacement
Infrastructure
Post-Bid
Milwaukee, West Allis, WI 53288

2021 Sidewalk Improvement Program
Results
$75,000 est. value
Milwaukee, WI

Asphalt Pavement Resurfacing, Replace Curb and Gutter, Sidewalk and Driveway Approaches Where Necessary
Infrastructure
Post-Bid
Milwaukee, WI

2021 Sidewalk Improvements
Results
Less than $288,500 est. value
Shorewood, WI 53211

Portable Restrooms, Holding Tanks, and Related Items
Term Contract
Post-Bid
West Allis, WI

Last Updated 07/27/2022 07:03 AM
Project Title

GMIA Park Lot Lighting

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Service/Term Contracts, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bid GMIA Park Lot Lighting: Bid GMIA Park Lot Lighting Line Items (Alternatives NOT Allowed): 8 EACH OPTEC OLA1-180-UNVH-40-5-RD-WH 40 EACH OPTEC OLA1-180-UNVH-40-5-SQ-WH *NOTE: There will be 3 more buys of this quantity of same lights: One more buy in 2022 Two more buys in 2023 Questions Due Date: Aug 1st 2022, 10:30 AM CDT Delivery shall be made not later than 30 calendar days after receipt of order release. Milwaukee County reserves the right to award a separate contract for each item; any group of items, all items; or to reject any or all bids or any portion of any or all bids when, in the opinion of the Purchasing Director, the best interest of the County will be served thereby.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents