Similar Projects
Last Updated | 09/20/2022 04:03 AM |
Project Title | Howard A. Hanson Dam (HAHD) Emergency Gate Stoplog and Hoist Replacement |
Physical Address | View project details and contacts |
City, State (County) | Ravensdale, WA 98051 (King County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $6,499,225 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Sep 16, 2022 Contract Award Number: W912DW22C0014 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: UM3PW6F8SCW1 Contractor Awarded Name: BCI Construction USA, Inc. Contractor Awarded Address: Pace, FL 32571-7304 USA Base and All Options Value (Total Contract Value): $6499225.00 The U.S. Army Corps of Engineers, Northwestern Division, Seattle District requires rehabilitation of the existing outlet tower emergency gate and hoist system at Howard A. Hanson Dam. The purpose of this project is to remove and dispose of the existing outlet tower emergency gate and hoist, retrofit the outlet tower structural members to handle the increased weight of the new hoist, construct and install the new emergency gate and hoist system, clean the 19-foot tunnel trash rack (with a diver), rig the 48-inch bypass trash rack, and remove and place the spare 7 ton stop log. The magnitude of construction is estimated to be between $1,000,000 and $5,000,000. The electronic version of the Solicitation can be access via PIEE Solicitation Module (link below). Amendment 01 issued on 13 May 2022 - see PIEE Solicitation Module for documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |