Last Updated 12/06/2018 03:19 PM
Project Title

Paving Work on Old Clairmont Road

Physical Address View project details and contacts
City, State (County) GA   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. Mill off existing pavement to a depth of 1 1/2 inch from gutter to gutter within work area. All cold patch material near trailhead is also to be removed. In that area, the 1 1/2 inch milling depth is measured below the cold patch. 2. Recycled asphalt concrete leveling as needed to allow for positive drainage to existing flume at northwest corner of bridge. 3. Install 1 1/2 inch of 12mm Superpave inlay over entire milled and/or leveled area. The approximate length of the work is 135 feet.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents