Similar Projects
Last Updated | 04/09/2021 09:10 AM |
Project Title | Cheshire Rail Trail III Loop Project |
Physical Address | View project details and contacts |
City, State (County) | Keene, NH (Cheshire County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $306,636 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is in the City of Keene the proposed work shall include, but not be limited to the following: · The installation of bicycle and pedestrian signage and 11,695 feet of shared lane and bike lane markings along West Street, Park Avenue and Summit Road. Improvements along West Street include reconstruction of some sidewalk ramps; · Improvements to Ami Brown Road beginning at Skyline Drive and running to the Cheshire Rail Trail (approximately 3,400 ft.), including brush clearing, drainage, grading and a crushed stone dust surface; · Upgrade of approximately 4,600 ft. of the existing Cheshire Rail Trail from Hurricane Road to Ami Brown Road including drainage, brush clearing, grading and crushed stone resurfacing; · Installation of two trailhead sites including parking areas with grading, installation of a crushed stone surface and brush clearing/grubbing. One trailhead parking area is located near the intersection of Summit Ridge Drive and Summit Road and the other is located on Whitcombs Mill Road. The project is to be completed in its entirety by July 30, 2021. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |