Similar Projects
2021 Sidewalk Improvement Project
Bidding
Newport, NH

Pleasant Street Revitalization Project
Bidding
Claremont, NH 03743

Nature Trail Construction
Post-Bid
Claremont, NH 03743

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Gilford, Seabrook, NH

Londonderry Rail Trail Phase V
Results
Londonderry, NH 03053

Paving Improvements
Results
Unity, NH

Miracle Mile Pedestrian Improvements, Phase 2-Contract 2021-1
Bidding
Less than $135,000 est. value
Lebanon, NH

Crosswalk Improvements
Post-Bid
Hinsdale, NH 03451

Weirs Community Center Walkway/Sidewalk Reconstruction Design/Build Services
Results
Laconia, NH

Transportation Alternatives Program
Post-Bid
Ashland, NH 03217

ADA Compliant Covered Ramp, Railing and Entryway for the Sutton Free Library
Results
Bradford, NH 03221

Steam Parking Lot
Post-Bid
$550,000 est. value
Concord, NH 03301

Sidewalk Project in Alton Bay - 2020
Results
Alton, NH

School Sidewalks and ADA Ramps
Results
Manchester, NH

Discretionary Sidewalk Improvements
Results
Manchester, NH

Last Updated 04/09/2021 09:10 AM
Project Title

Cheshire Rail Trail III Loop Project

Physical Address View project details and contacts
City, State (County) Keene, NH   (Cheshire County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $306,636
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is in the City of Keene the proposed work shall include, but not be limited to the following: · The installation of bicycle and pedestrian signage and 11,695 feet of shared lane and bike lane markings along West Street, Park Avenue and Summit Road. Improvements along West Street include reconstruction of some sidewalk ramps; · Improvements to Ami Brown Road beginning at Skyline Drive and running to the Cheshire Rail Trail (approximately 3,400 ft.), including brush clearing, drainage, grading and a crushed stone dust surface; · Upgrade of approximately 4,600 ft. of the existing Cheshire Rail Trail from Hurricane Road to Ami Brown Road including drainage, brush clearing, grading and crushed stone resurfacing; · Installation of two trailhead sites including parking areas with grading, installation of a crushed stone surface and brush clearing/grubbing. One trailhead parking area is located near the intersection of Summit Ridge Drive and Summit Road and the other is located on Whitcombs Mill Road. The project is to be completed in its entirety by July 30, 2021.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents