Similar Projects
RFQ Design - CDBG Possum Hollow Park Lighting
Infrastructure
Conception
$400,000 CJ est. value
Slidell, LA 70458

Menetre Boat Launch - City of Covington
Infrastructure
Conception
$850,000 CJ est. value
Covington, LA 70433

LA 3292: LA 40-wash P/L (Isabel Swamp Rd)
Infrastructure
Design
$2,500,000 CJ est. value
Lacombe, LA 70445

LA 3292: LA 40-wash P/L (Isabel Swamp Rd)
Infrastructure
Design
$2,500,000 CJ est. value
Lacombe, LA 70445

Jahncke Street Overlay
Infrastructure
Bidding
$800,000 CJ est. value
Covington, LA 70433

Jahncke Street Overlay
Infrastructure
Bidding
$800,000 CJ est. value
Covington, LA 70433

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

Civil Site Work for Three Artificial Turf Fields, STPSB Project
Infrastructure
Results
LA

Bayou De Zaire - Lalanne Rd
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Slidell Memorial Hospital SMH Three Story Building Addition
Addition, Demolition, Infrastructure
Construction
$36,000,000 CJ est. value
Slidell, LA 70458

Station 19 Fire Station
New Construction, Infrastructure
Construction
$1,493,300 CJ est. value
Slidell, LA 70461

Medline Distribution Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$53,000,000 CJ est. value
Covington, LA 70433

Medline Distribution Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$53,000,000 CJ est. value
Covington, LA 70433

Columbia Street Bridge Replacement - City of Covington
Infrastructure
Conception
$1,500,000 CJ est. value
Covington, LA 70433

Last Updated 04/20/2023 03:15 PM
Project Title

2023 District Panel Replacements

Physical Address View project details and contacts
City, State (County) Mandeville, LA 70470   (Saint Tammany County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $440,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All labor, materials, equipment and supervision necessary to furnish, install, maintain and remove temporary construction barricades, precast concrete barriers, lights, signals, pavement markings and signs, including project signs; providing flaggers; and complying with all other requirements regarding the protection of the work, workers and safety of the public. Unless otherwise noted in the plans or special provisions this work also includes traffic control management in compliance with contract documents and the Manual on Uniform Traffic Control Devices (MUTCD), including the installation, inspection, maintenance, and removal of all traffic control devices on the project. This item shall not be construed to relieve the contractor of responsibilities for the safety of the public, for liability in connection therewith, or compliance with State and local laws or ordinances. Signs, barricades, barriers, channelizing devices, pavement markings, etc., shall comply with plan details, the MUTCD and Section 713 of LADOTD Standard Specifications for Roads and Bridges, Latest Edition. Construction work shall not begin until signs, barricades, project signs and other traffic devices have been erected and approved

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents