Similar Projects
Last Updated | 10/11/2021 06:59 AM |
Project Title | Resurfacing on S.R. 57 from S.R. 14 (L.M. 0.00) to U.S. 64 (U.S. 70, U.S. 79, S.R. 1) (L.M. 0.49) |
Physical Address | View project details and contacts |
City, State (County) | TN (Shelby County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project No. NH/HSIP-57(86), 79028-8274-14 (PIN 130287.00), 79028-3274-94 (PIN 130287.00) The resurfacing on S.R. 57 from U.S. 64 (U.S. 70, S.R. 1) (L.M. 0.49) to Poplar Avenue (L.M. 1.20). Project Length - 0.710 miles Project No. STP/HSIP-57(87), 79028-8275-14 (PIN 130309.00), 79028-3275-94 (PIN 130309.00) The resurfacing on S.R. 57 from S.R. 14 (L.M. 0.00) to U.S. 64 (U.S. 70, U.S. 79, S.R. 1) (L.M. 0.49). Project Length - 0.490 miles Item No. Description Quantity Units 202-03.01 Removal Of Asphalt Pavement 667.000 s.y. 203-06 Water 4.000 m.g. 303-02 Mineral Aggregate, Type b Base, Grading (Description) (c Or d) 452.000 Ton 307-01.01 Asphalt Concrete Mix (Pg64-22) (Bpmb-Hm) Grading a 184.000 Ton 307-02.01 Asphalt Concrete Mix (Pg70-22) (Bpmb-Hm) Grading a 123.000 Ton 403-02.01 Trackless Tack Coat 29.000 Ton 411-02.10 Acs Mix(Pg70-22) Grading d 4,523.000 Ton 415-01.01 Cold Planing Bituminous Pavement 4,125.000 Ton 611-09.01 Adjustment Of Existing Catchbasin 35.000 Each 701-01.01 Concrete Sidewalk (4 ") 1,150.000 s.f. 701-02.01 Concrete Curb Ramp (Retrofit) 6,042.000 s.f. 701-02.06 Detectable Warning Surface (Rehabilitation) 10.000 s.f. 712-01 Traffic Control (1) Ls 712-06 Signs (Construction) 1,862.000 s.f. 712-08.03 Arrow Board (Type c) 4.000 Each 716-02.04 Plastic Pavement Marking(Channelization Striping) 1,246.000 s.y. 716-02.05 Plastic Pavement Marking (Stop Line) 730.000 l.f. 716-02.06 Plastic Pavement Marking (Turn Lane Arrow) 38.000 Each 716-02.09 Plastic Pavement Marking (Longitudinal Cross-Walk) 1,354.000 l.f. 716-02.11 Plastic Pavement Marking (6" Dotted Line) 731.000 l.f. 716-03.01 Plastic Word Pavement Marking (Only) 19.000 Each 716-04.05 Plastic Pavement Marking (Straight Arrow) 1.000 Each 716-05.20 Painted Pavement Marking (6" Line) 6.225 l.m. 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 6.225 l.m. 716-12.05 Enhanced Flatline Thermo Pvmt Mrkng (6in Dotted Line) 534.000 l.f. 717-01 Mobilization (1) Ls 730-03.20 Install Pull Box (Type a) 2.000 Each 730-03.21 Install Pull Box (Type b) 2.000 Each 730-12.01 Conduit 1" Diameter (Pvc) 120.000 l.f. 730-14.01 Shielded Detector Cable 60.000 l.f. 730-14.02 Saw Slot 2,446.000 l.f. 730-14.03 Loop Wire 5,644.000 l.f. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |