Similar Projects
Crossroads Boulevard/Lehi Main Street Widening Project
Post-Bid
Less than $13,115,529 est. value
Lehi, UT 84043

Bike-Skills Trails Park Phase 2
Post-Bid
Orem, UT 84057

Neighborhood ADA Ramp Upgrades
Results
Midvale, UT 84047

3200 West Sidewalks
Results
$250,000 to $300,000 est. value
West Jordan, UT 84088

SLC Airport Parking Lot E Pedestrian Canopy
Post-Bid
Salt Lake City, UT 84122

2020 Replacement and New Construction of Sidewalk, Curb and Gutter and Storm Drain Facilities at Random Locations
Results
$606,154 est. value
Bountiful, UT 84010

Slc Airport Aoc Vehicle Canopy
Post-Bid
Salt Lake City, UT 84122

Y--Provo Area Office Parking Lot Replacement
Results
$1,000,000 to $5,000,000 est. value
Provo, UT 84606

Orangeville City Sidewalk Project
Post-Bid
Orangeville, UT 84537

Parking Structure Demolition and New Construction
Demolition
Results
Ogden, UT

Station 115 Parking Lot Concrete Repair
Post-Bid
UT 84006

Jordan River Trail Bridges
Results
West Jordan, UT 84088

Sunrise Elementary East Parking Lot Expansion
Post-Bid
Smithfield, UT 84335

2020 Trail Maintenance Project
Results
West Haven, UT 84405

City Wide Park Walkway Safety SLC Library Plaza Paver Replacement
Post-Bid
Salt Lake City, UT 84111

Last Updated 10/28/2021 08:46 AM
Project Title

DFCM Construction - DSU Softball Parking Lot

Physical Address View project details and contacts
City, State (County) Saint George, UT 84770   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of removing an existing softball field and constructing a parking lot in its place. Also included is removing a campus asphalt roadway on 800 E and re-constructing it into a concrete walkway. Clearing and grubbing, mobilization, 3 inch HMA PG 58-28 (1/2" mix), saw cutting, remove asphalt, asphalt emulsion seal coat, excavation, untreated base course, granular borrow, curb and gutter, 30 inch curb and gutter, 4 inch concrete flatwork, 6 inch reinforced concrete flatwork, 6 inch curb wall, reconstruct manhole, remove parking blocks, concrete parking blocks, remove concrete, 18 inch ads pipe, irrigation, remove irrigation box, landscape, remove landscape rock, 8 foot fence, remove fence, pavement marking paint, sign, post and base, remove signs, electrical

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents