Similar Projects
Underground Utility Locating
Term Contract
Bidding
Raleigh, NC 27610

Underground Utility Repair
Term Contract
Bidding
Raleigh, NC 27610

Fuel Farm Relocation Project
Post-Bid
Stoneville, NC

Inactive UST Closure and Environmental Remediation
Post-Bid
Jackson Springs, NC 27281

Centennial Campus Utility Infrastructure Thermal Energy Storage
Results
Less than $5,289,691 est. value
Raleigh, NC

Landfill Gas System Expansion Project
Results
NC

Removal of Underground Fuel Storage Tank Old Richlands Elementary School
Bidding
Richlands, NC 28574

Fuel System Improvements
Post-Bid
Wallace, NC

Aviation Fuel Management System
Results
Charlotte, NC

Replace Natural Gas Piping (House Piping)
Bidding
Weldon, NC 27890

Natural Gas Blanket Construction
Post-Bid
Lexington, NC

Fuel Oil Tank Expansion
Results
$850,000 est. value
Raleigh, NC

Gas System Improvements
Post-Bid
Shelby, NC

Refurbishment of a Rail Tank Car Training Prop
Term Contract
Results
Lumberton, NC

Underground Storage Tank Removal
Post-Bid
Cary, NC

Last Updated 01/21/2019 11:14 AM
Project Title

Fuel Farm Pump Station Additions

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Installation of two additional pumping stations at the CLT Fuel Farm. Most pump station piping is in place from a previous project but some minor piping is required. This project will include the motors, pumps, filter assemblies and associated components to increase the Fuel Farm pump station from six pumps to eight pumps. In addition to the pumps the project includes associated electrical upgrades including the installation of two new motor control centers and associated controls work.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents