Similar Projects
Hudson Tunnel Project
Conception
$11,300,000,000 est. value
New York, NY

AirTrain Newark Replacement Project
Post-Bid
$2,000,000,000 est. value
Newark, NJ 07114

South Kearny Double Track Project
Renovation
Post-Bid
Kearny, NJ

In-Floor Train Car Hoist
Results
$5,825,000 est. value
Lindenwold, NJ 08021

FY 2018 Railroad Rehabilitation
Results
$5,500,000 to $6,800,000 est. value
Salem, NJ 08079

Waverly Loop Rail Project
Pending Verification
Newark, NJ 07105

Foundation Infrastruture Upgrades
Post-Bid
Clark, NJ

PATH - Hack West Crossover and Replacement of Track and Turnouts at Kearny Pocket
Results
$20,000,000 to $30,000,000 est. value
NJ

115 RE Running Rail for Path
Post-Bid
Jersey City, NJ

Way Interlocking and Subway Structure Rehabilitation
Results
Camden, NJ 08101

Rail Facility
Build-Out
Post-Bid
Ocean City, NJ 08226

PATH - Harrison Station Southwest Head House, Platform and Plaza Replacement
Results
$20,000,000 to $30,000,000 est. value
Harrison, NJ

Professional Construction Management and Inspection Services
Post-Bid
Hoboken, NJ

Lyndhurst Station, Delafield Avenue and Court Street
Results
Newark, NJ 07105

Continuous Welded Rail
Post-Bid
Newark, NJ

Last Updated 06/09/2020 08:38 AM
Project Title

Lyndhurst Train Station Replacement Project

Physical Address View project details and contacts
City, State (County) Newark, NJ   (Essex County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes, but is not limited to, the following: • Installation of mini-pile foundation systems • Installation of high-level concrete platforms • New Station building with heated and air-conditioned waiting rooms on both tracks • Installation of a backup generator for the entire facility • Installation of new stairways from the station area to the high-level platform area • Installation of four elevator systems to the new High-Level Platforms (HLPs) • Installation of new parking areas on each side of the tracks • New platform and parking lot lighting systems • Line and surfacing track areas to meet new platform elevations and geometry • Clearing and grading the site for new construction • Installation of new utilities • Installation of grade beams • Installation of masonry and brickwork • Installation of steel framework support structure • Installation of Platform canopy structure

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents