Similar Projects
Ballfield Complex Parking - FP078 - City of Davenport
Infrastructure
Conception
$150,000 est. value
Davenport, IA 52807

Bridgeview Elementary School 2022 Parking Lot Improvements
Infrastructure
Post-Bid
$500,000 est. value
Le Claire, IA 52753

East 2nd St. Streetscaping
Infrastructure
Results
Davenport, IA 52801

Sunderbruch Trail Repairs
Infrastructure
Results
Davenport, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Crow Creek Park Quarry Parking Lot Reconstruction
Infrastructure
Results
Bettendorf, IA

Emeis Park ADA Access Improvements
Infrastructure
Results
Davenport, IA 52804

Freight House West Ramp Repairs
Infrastructure, Alteration
Results
Davenport, IA

PCC Sidewalk/Trail
Infrastructure
Results
IA

PCC Sidewalk/Trail
Infrastructure
Results
Le Claire, IA

Police Department Parking Ramp East Wall Repair
Renovation, Alteration
Results
Davenport, IA 52801

CY 22 City Property Sidewalk Program
Term Contract
Results
Davenport, IA

CY 22 Sidewalk Program
Term Contract
Results
Davenport, IA

CY22 ADA Ramp Program
Term Contract
Results
Davenport, IA

FY23-24 Contract Sewer Repair Program
Term Contract
Results
Davenport, IA

Last Updated 06/29/2022 01:59 PM
Project Title

2022 Sidewalk Repair Program

Physical Address View project details and contacts
City, State (County) Bettendorf, IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing and replacing 4-inch and 6-inch thick P.C.C. sidewalk and ADA curb ramps compliant with the Americans with Disabilities Act Accessibility Guidelines (ADAAG). Work includes removal and replacement of existing P.C.C. sidewalk, driveway and curb ramps, installing detectable warning tile at ADA curb ramps, constructing a modular block retaining wall, sidewalk curb, P.C.C. curb and gutter removal and replacement and reshaping disturbed areas and grades including 4- inch deep select topsoil and related fertilizing, sodding and watering.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents