Similar Projects
Fire Station 62 HVAC Replacement
Alteration
Bidding
South Jordan, UT 84095

Airport Operations Center HVAC
Alteration
Bidding
Salt Lake City, UT 84122

Monticello High School HVAC
Post-Bid
Monticello, UT 84535

Inspection and Preventative Maintenance of HVAC Systems in Various City-Owned Buildings
Post-Bid
Ogden, UT 84401

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

Sorenson Multi-Cultural Center Phase 2, Pool Air Handler Replacement
Results
Less than $1,099,944 est. value
Salt Lake City, UT 84104

DFCM Construction - Pre-Qualified Mechanical - UVU UCCU Events Center Fanwall Replacement
Term Contract
Bidding
$700,000 est. value
Orem, UT 84097

Removal and Installation of 6 Ton HVAC Unit for One Building
Post-Bid
Price, UT

USDC Chiller Replacement
Results
Less than $1,150,000 est. value
American Fork, UT 84003

HVAC System Controls
Alteration
Bidding
Beaver, UT 84713

Kitchen Vent Hood Inspection and Cleaning
Post-Bid
Sandy, UT 84093

HVAC Equipment for Portable Classrooms
Results
Less than $50,000 est. value
Salt Lake City, UT 84115

UVU Gunther Trades Cabinet Shop Dust Collector
Term Contract
Bidding
$230,000 est. value
Orem, UT 84058

CM/GC Administration Building HVAC Renovation
Post-Bid
Farmington, UT 84025

Air Sanitation System for Air Handlers
Results
South Jordan, UT 84095

Last Updated 01/27/2022 09:01 AM
Project Title

Automatic Temperature Controls(ATC) Upgrade - Lehi Junior High School

Physical Address View project details and contacts
City, State (County) Lehi, UT 84043   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Upgrading the automatic temperature control (ATC) system or building automation control system. 2. Provision and installation of the upgraded automatic temperature control system as indicated on drawings and within the specifications which includes but is not limited to, all control wings, electrical components, Variable Frequency Drives (VFDs), and automatic valves. 3. It is the intent that this construction shall start as soon as possible and be completed on or before August 1st, 2022. 4. The work to be done under this section includes the furnishing of all labor, materials, equipment, controls and accessories required to complete all heating, air conditioning and other mechanical systems as shown on plans and/or described in these specifications, including miscellaneous items required to provide a complete and functional facility. 5. Work shall include, but shall not be necessarily limited to mechanical systems, and automatic control systems. 6. The contractor shall provide all miscellaneous electrical work and control wiring for special systems where the wiring requirements are provided by the equipment manufacturers and/or suppliers. 7. This project is being funded through an ESSER Federal Grant. This may require additional documentation and inspections throughout the project. Davis?Bacon Wages will be required.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents