Similar Projects
Solar Carports
Post-Bid
Kingston, New Paltz, NY 12402

Fulton Highway Garage and Town Hall Renovation
Renovation, Term Contract - 19,440 SF
Post-Bid
Fulton, NY

Replacement of the Glide Slope Equipment Shelter at the Sullivan County Airport, Swan Lake, New York.
Results
$25,000 to $150,000 est. value
Swan Lake, NY

Olympic Jumping Complex Gondola
Results
Lake Placid, NY 12946

Hoosick Falls Highway Garage
Construction
Hoosick Falls, NY 12090

Statewide Cashless Tolling Design-Build Project Exits 16 - 61 Plus B1-B3
Construction

Highway Facility Overhead Door and Building Roof Replacement
Post-Bid
East Syracuse, NY

Fuel Station Upgrade at Putnam Highway Barn
Renovation
Results
Fort Edward, NY

Best Buy #0781
Renovation
Construction
$100,000 est. value
Nichols, NY 13812

Improvements for Uncle Sam Transit Center
Post-Bid
Albany, NY

Hartford CSD 2016 Capital Project
Results
Less than $3,225,000 est. value
Hartford, NY 12838

Expansion for Troy Bus Operations Center
Post-Bid
Albany, NY

Fuel Station Upgrade at Granville Highway Barn
Results
Fort Edward, NY

Pre-Fabricated Bus Shelters
Term Contract
Post-Bid
Buffalo, NY 14203

Clyde Savannah CSD - Bus Garage Alterations and Site Improvements
Results
Clyde, NY 14433

Reported 08/15/2019 12:00 AM
Project Title

NYSDOT Tompkins County Sub-Residency Building and Site Construction

Physical Address View project details and contacts
City, State (County) Ithaca, Lansing, NY 14882   (Tompkins County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Includes asphalt concrete pavement, drainage, water & sanitary sewer work. The new NYSDOT facility will consist of office space, workshop space, truck parking and salt storage. The approximate square footage of the various structures are as follows: subresidency maintenance building (30,000 SF), cold storage (5,000 SF), salt barn (8,200 SF), hopper building/covered lean-to (2,500 SF). vehicle storage for 10 trucks, a loader and tow plow, with one additional double depth mechanical bay and single depth, drive-thru truck washing bay. It also includes an office area (three rooms), lunch/break room (30 people), toilet/shower/locker rooms, storage rooms and mechanical/electrical rooms. The site will also contain stockpile areas for pipe, stone and millings, and ancillary site features including a fueling station, parking for 40 vehicles, and storm water management facilities. The project will require construction of an access drive from Warren Road and the extension of utilities.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents