Similar Projects
Ballfield Lighting Replacements - Phase III
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Casper, WY 82601

Generator Installation
Renovation
Sub-Bidding
$300,000 CJ est. value
Casper, WY 82604

Shell Falls Power Grid Installation
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Sheridan, WY 82801

Annual Miscellaneous Electrical Service Drops
Term Contract
Post-Bid
Gillette, WY

Generator Replacement
Alteration
Results
$230,000 est. value
Cheyenne, WY 82007

LED Lighting Upgrade
Alteration
Results
$35,000 est. value
WY

Civic Center Lighting and Lighting Control Upgrade
Renovation
Sub-Bidding
$300,000 CJ est. value
Cheyenne, WY 82001

Northwest College Campus Lighting Upgrades
Alteration
Post-Bid
$200,000 to $300,000 est. value
Powell, WY 82435

Solid Waste Thermal Lenses and CRL Electrical Service Improvements
Renovation
Results
$382,550 CJ est. value
Evansville, WY 82636

Dubois K-12 Backup Power Generator Installation
Renovation
Sub-Bidding
$125,000 CJ est. value
Dubois, WY 82513

Flourescent Lighting
Term Contract
Post-Bid
Gillette, WY

BCPA Mainstage Theater Dimming and Lighting Controls- Phase I
Renovation - 77,008 SF
Results
$282,800 CJ est. value
Laramie, WY 82071

Remove 94 High Mast Light Towers, Install 71 High Mast Light Towers, and Install Roadway Lighting
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Bosler, WY 82051

Electrical Inspection Services
Alteration
Post-Bid
Cody, WY

City Network Operations Core Layer 3 Switch Replacement
Renovation
Results
$70,777 CJ est. value
Cheyenne, WY 82001

Last Updated 10/17/2023 06:09 AM
Project Title

Douglas Water Treatment Plant Heating System Improvements

Physical Address View project details and contacts
City, State (County) Douglas, WY 82633   (Converse County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $508,400 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Project is located at the Douglas Water Treatment Plant, located behind the City of Douglas Public Works Building (420 Grant St. Douglas, WY 82633). Est. Completion Date: Sept. 27, 2024 The Project generally consists of replacing boiler heating system piping inside the Douglas Water Treatment Plant. The project includes removal of existing heating system components and installing new heating system components (i.e. piping, piping insulation, support hangers, unit heaters, thermostats and wiring, ductwork, etc.). Existing boilers and boiler pumps will not be replaced.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents