Similar Projects
Sidewalk Installation - General Bid
Infrastructure
Bidding
$100,000 CJ est. value
Camp Douglas, WI 54618

Sidewalk Installation - General Bid
Infrastructure
Bidding
$100,000 CJ est. value
Camp Douglas, WI 54618

Single and Double Seal Coating
Infrastructure
Post-Bid
$200,000 est. value
Necedah, WI

Main Street Alley and Property Grading
Infrastructure
Post-Bid
$200,000 est. value
Elroy, WI 53929

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Tennis Courts
Results
Mauston, WI 53948

Native American Church Parking Lot
Construction
Lyndon Station, WI 53944

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arby's / Mauston
New Construction, Infrastructure - 2,676 SF
Pending Verification
$800,000 CJ est. value
Mauston, WI 53948

Pizza Ranch
New Construction, Infrastructure - 8,585 SF
Pending Verification
$2,700,000 CJ est. value
New Lisbon, WI 53950

Sidewalk Installation - MEP
Infrastructure
Bidding
$486,000 CJ est. value
Camp Douglas, WI 54618

City Of Elroy Main Street Alley And Property Grading
Infrastructure
Post-Bid
$100,000 est. value
Elroy, WI

Main Street Alley Utility Replacement
Infrastructure
Results
Elroy, WI 53929

Seal Coast Surfacing
Infrastructure
Post-Bid
$60,000 est. value
Elroy, WI

Juneau County Structure Repair, B-29-18, 19, 44, 45
Infrastructure
Results
$75,000 est. value
WI

Last Updated 04/12/2023 12:36 PM
Project Title

SRSTC North Section Roadway and Parking Lot Improvements - State of Wisconsin - Department of Health Services

Physical Address View project details and contacts
City, State (County) Mauston, WI 53948   (Juneau County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $2,940,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 12, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: HEALTH SERVICES - SECURE TREATMENT FACILITY, MAUSTON This project will replace or resurface the original roadways and parking areas on the SRSTC. These roadways and parking areas were installed in 2001 and are badly deteriorated and are in need of repair. This project replaces approximately 21,600 square yards of pavement. Some of this work is inside the secure perimeter.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents