Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Seal Beach Pump Station Replacement - Orange County Sanitation District
Renovation
Bidding
$78,923,000 CJ est. value
Seal Beach, CA 90740

RFQ Engineering - Engineering Services for the Construction of the Temperance Avenue Sewer Trunk Line
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Fresno, CA 93721

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Commercial Industrial Services (CIS) Pumps and Motors Repair
Term Contract
Sub-Bidding
San Diego, CA 92136

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

Architectural Engineering And Related Professional Technical Support Services
Term Contract
Post-Bid
CA

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

As Needed Plumbing Services
Term Contract
Results
$200,000 est. value
CA

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

Lemoore Sanitary Sewer Lift Station 9
Infrastructure
Bidding
$3,750,000 CJ est. value
Lemoore, CA 93245

Boiler Repair and Maintenance/Plumbing Services
Term Contract
Sub-Bidding
Santa Ana, CA 92701

Rehab Bid Package for 1 Parrot St Vallejo Ca
Alteration
Post-Bid
Vallejo, CA

Building A & B Modernization Project at Chester Elementary School - Plumbing
Alteration
Results
Chester, CA 96020

Petaluma River Turning Basin Float, Pile, and Gangway Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Petaluma, CA 94952

Last Updated 07/25/2023 02:49 PM
Project Title

Science Center Sump Pumps

Physical Address View project details and contacts
City, State (County) San Pablo, CA 94806   (Contra Costa County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

: The Scope of Work consists of general construction including, but not limited to: Installation of sump pumps including power and drain piping; extension of existing curb; provide weatherproof vault covers; seal existing conduits and drainage at existing generator pad. 2022.033.01 All questions related to this project must be submitted electronically, no later than July 31, 2023, prior to 5:00 PM, to: Ben M. Cayabyab, Contracts Manager Contra Costa Community College District Email: bcayabyab@4cd.edu Cost Estimate (Range): $90,000 to $100,000 CA License Required: Class "B" General Building Contractor or Class "A" General Engineering Contractor Last Date/Time for Bidder's Requests for Information (RFI): July 31, 2023, prior to 5:00 PM This project is a public works project and is subject to prevailing wage rate laws.A copy of the prevailing rates of wages is on file with the Contracts & Purchasing Office of the Contra Costa Community College District also available at the DIR website Said rates of wages will be included in the contract for the work. Attention is directed to Section 4100 through 4113 of the Public Contract Code concerning Subcontractors, with emphasis on Section 4104, known as the "Subletting and Subcontracting Fair Practices Act, effective July 1, 2014. Attention is directed to Labor Code Section 1725.5 regarding Department of Industrial Relations (DIR) contractor registration process including registration criteria and implementation of DIR registration requirements. Labor Code Section 1771.7 establishes contractor's obligation to submit Certified Pay Roll (CPR) to the Department of Labor and Standards Enforcement (DLSE) and public works monitoring and enforcement. Labor Code Section 1773.3 requires the District to submit a PWC-100 to DIR for all public works contract awarded effective January 1, 2015. Site Visit Certification (Section 00450) shall be authorized by the representative of the District and shall be submitted with the bid. Failure to submit all of the above may cause your bid to be non-responsive and disqualified for contract award. All questions related to this project must be submitted electronically.Ben M. Cayabyab, Contracts Manager Contra Costa Community College District Email: bcayabyab@4cd.edu. Each bid shall be made on the Bid Proposal Form, which is included in the Bid Documents and when submitted, shall be accompanied by a Bid Bond or Certified Cashier's Check in the amount of 10% of bid (made payable to the Contra Costa Community College District). The District reserves the right to forfeit Bid Bond submitted for failure of the successful bidder to secure Payment and Performance Bonds. The successful bidder will be required to furnish a payment bond in an amount equal to one hundred percent (100%) of the contract price and a faithful performance bond in an amount equal to one hundred percent (100%) of the contract price, said bonds to be secured from a surety company acceptable to the Contra Costa Community College District and authorized to execute such surety in the State of California. Certificates of Liability Insurance with proper endorsements shall be required for the successful bidder. The contract time is 91 Calendar Days between the Notice to Proceed date and the Contract Substantial Completion date. Liquidated Damages shall be set for One Hundred Dollars ($100.00) for each Calendar Day the Work is delayed beyond the contract Substantial Completion date; and One Hundred Dollars ($100.00) for each Calendar Day Remaining Work is delayed beyond the Contract Final Completion Date. The Contra Costa Community College District reserves the right to reject any and all bids and/or waive any informality or irregularity in any bid received. No bidder may withdraw their Bid for a period of fifteen (15) Calendar Days after the date set for opening thereof.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents