Similar Projects
Janitorial Services
Alteration
Bidding
Franklin Township, NJ 08873

Janitorial Maintenance
Post-Bid
Somerville, NJ 08807

Custodial Services for the Lower Montgomery Middle School
Post-Bid
Montgomery, NJ 08558

Alterations at Franklin Board Admin Campus
Renovation
Results
Somerset, NJ 08873

Science Laboratory Renovations at William Annin Middle School
Renovation
Results
Basking Ridge, NJ 07920

Rutgers Preparatory School Addition
Addition - 1,449 SF
Construction
Somerset, NJ 08873

Proposed ESCO Energy Savings Improvements
Renovation
Construction
Warren, NJ 07059

District Wide Facilities ADA Improvements (Phase III)
Renovation
Post-Bid

Interior Alterations and Renovations at the Robert Morris School
Renovation
Results
South Bound Brook, NJ 08880

Operation and Maintenance Engineering Enhancement Support Services - 7th Generation
Term Contract
Post-Bid

Security Vestibules at Pine Grove Manor, Mac Afee, and Conerly Elementary Schools
Renovation
Results
Franklin Township, NJ 08873

Janitorial Services
Term Contract
Post-Bid
Somerset, NJ

New Storage Building at Van Derveer Elementary School
New Construction
Results
$320,000 est. value
Somerville, NJ 08876

Janitorial Services
Post-Bid
Irvington, NJ 07111

Gym Facade Renovation at Cedar Hill, Woodmont and William Mason Elementary Schools
Alteration
Results
$1,200,000 est. value
Basking Ridge, Montville, NJ 07045

Last Updated 07/25/2022 02:32 PM
Project Title

2022 Custodial and Maintenance Operation and Management Services

Physical Address View project details and contacts
City, State (County) South Bound Brook, NJ 08880   (Somerset County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Janitorial/Maintenance, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate - 07/25/22
Owner View project details and contacts
Architect View project details and contacts
Description

All bidders must use and complete all bid forms and must comply with every requirement contained in the instructions and specifications. Bids are to be marked in a sealed envelope and delivered to the Business Administrator/Board Secretary, with the name of the project, 2022 Custodial and Maintenance Operation and Management Services, plainly marked on the front of the envelope. Every bid must be accompanied by a certified check or a bid bond in an amount not less than 10% of the bid or $20,000.00, whichever is less. All bids must be accompanied by a New Jersey Business Registration Certificate issued by the New Jersey Department of Treasury, Division of Revenue. Bidders are required to comply with the requirements of N.J.S.A. 10:2-1 et seq., The Law Against Discrimination and Affirmative Action, N.J.S.A. 10:5- 31 et seq. and N.J.A.C. 17:27-1.1. et seq. No bid may be withdrawn for a period of 60 days from the opening of the bids. The South Bound Brook Board of Education reserves the right to reject any or all bids and waive any informality in the bidding process if it is in the best interest of the Board of Education. The contract, if awarded, shall be awarded to the lowest responsible bidder. No bid shall be deemed accepted until the adoption of a formal resolution by the South Bound Brook Board of Education.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents