Similar Projects
District Wide Security Upgrades, Paving Projects and Chiller
Post-Bid
Clinton Township, MI 48038

Eastpointe Memorial Library Air Handling Unit Replacement
Post-Bid
Eastpointe, MI 48021

Roseville - Mechanical Renovations - BP07
Results
Roseville, MI

SJ Data Center Cooling Upgrades
Results
Clinton Township, MI

MERV-13 Filters
Post-Bid
Warren, MI 48089

Lakeview High School Pool/Gym/Cafeteria Areas Temperature Controls Replacement
Results
Saint Clair Shores, MI

USCG Replace Furnaces at CG Airsta Detroit, Mt. Clemens, MI
Post-Bid
Mount Clemens, MI

Lakeview Public Schools Pool and Gym Improvement_Bp3
Results
Saint Clair Shores, MI 48081

2020 Admin HVAC
Post-Bid
Warren, MI 48089

Fraser Senior Activity Center RTU Replacement Project
Results
Less than $33,210 est. value
Fraser, MI 48026

Memorial Library HVAC Improvements
Post-Bid
Eastpointe, MI 48021

Straight Rail Vehicle Exhaust Removal System
Results
Mount Clemens, MI 48043

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Unit Replacements
Results
Sterling Heights, MI

Center Line High School Band and Counseling HVAC Improvements Project
Post-Bid
Center Line, MI 48015

Reported 08/08/2020 12:00 AM
Project Title

Recirculating Air in Test Cells at Detroit Arsenal, Warren, MI

Physical Address View project details and contacts
City, State (County) Warren, MI   (Macomb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The project shall reduce costs through energy savings associated with modifications to the air flow system to the test cells and installation of an energy storage system to recycle electricity generated during testing. Modifications to the air flow system includes replacing manually controlled ventilation fan’s exhaust dampers with remotely controlled pneumatic actuators and all related items for the Test Cell’s one through eight; replace existing feeder conduit and wiring; install new steam meters for Building 212. The energy storage system shall include a battery storage system to store 300kW (1,200 kW-hr) of regenerative power from test cell dynamometers including all necessary infrastructure improvements necessary to expand battery system in increments of 50kW (200 k-W-hr) in the future. The system will connect to a distribution panel board allowing for the future addition of additional battery units, a step up transformer to connect the 480 volt energy storage system to the medium voltage building distribution system. Power metering will be added to the medium voltage distribution system to provide the energy storage system with the data required to efficiently control the drawing and supplying of power to the distribution system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents