Project Title

Southside Interceptor CIPP Sewer Rehabilitation Phase 2

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98687   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,662,108
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish and install approximately 2,794 lineal feet of 36-inch of Cured-In-Place Pipe (CIPP) to rehabilitate existing sanitary sewer mains The CIPP is to be designed for fully deteriorated gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with either steam cured or ultraviolet (UV) cured CIPP. This work will also include customer notification, bypass pumping, cleaning, root and sediment removal, initial Closed Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection. Work will also consist of epoxy or polyurethane lining of 9 manholes for corrosion prevention in conjunction with the proposed CIPP lining.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents