Similar Projects
Cold Plane and Place HMA, Replace Guardrail and Curb Ramps
Infrastructure
Bidding
$11,400,000 est. value
Belmont, CA 94002

2023 On-Call Sidewalk Repair Project
Infrastructure
Bidding
San Carlos, CA

Quick Build Pedestrian Improvements Project
Infrastructure
Post-Bid
$73,500 est. value
Millbrae, CA 94030

Outdoor Improvements at Four Sites
Infrastructure, Alteration
Post-Bid
Pacifica, CA 94044

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Middle Avenue and Nealon Park Pedestrian Improvements Project
Infrastructure
Results
Menlo Park, CA

Citywide Street Rehabilitation Package 3-B (Phase 1) Project
Term Contract
Post-Bid
$3,100,000 est. value
San Mateo, CA

Hillside Boulevard Pedestrian Crossing Enhancements
Infrastructure
Results
South San Francisco, CA 94083

Kelly Avenue Intersections Project
Infrastructure
Post-Bid
$182,697 est. value
Half Moon Bay, CA 94019

Midcoast Multi-Modal Trail Improvements Project
Infrastructure
Results
$3,332,000 est. value
CA

2022 Pavement Maintenance Project
Infrastructure
Post-Bid
Millbrae, CA

Caltrain Access and Bay Trail Gap Closure
Infrastructure
Results
South San Francisco, CA 94080

North Pacifica Pedestrian Improvement
Infrastructure
Results
Pacifica, CA

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

2022 Sidewalk Repair Program
Infrastructure
Results
$1,000,000 est. value
Burlingame, CA

Last Updated 06/08/2022 12:42 AM
Project Title

Sharon Road Sidewalk Installation Project

Physical Address View project details and contacts
City, State (County) Menlo Park, CA 94025   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally includes installing ADA compliant sidewalks, driveways, curb ramps, curb and gutters, valley gutters, signing and striping, storm drain inlets, and asphalt plugs, slurry seals, and dig-out repairs along Sharon Road from Alameda de las Pulgas to Altschul Ave. The project also includes relocating frontage features, grading conforms, and landscaping and mulching behind the back of sidewalk

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents