Similar Projects
North Edgehill Commons
New Construction, Infrastructure - 160,000 SF
Design
$361,000,000 CJ est. value
Nashville, TN 37203

MTRO Essential Maintenance
Renovation, Infrastructure
Design
$3,400,000 CJ est. value
Nashville, TN 37214

2021 Community Development Block Grant (CDBG) Sanitary Sewer Line Extensions
Infrastructure
Bidding
$400,000 CJ est. value
Harrogate, TN 37752

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

Bedford Country Higher Education Center for Tennessee College of Applied Technology (TCAT) - Shelbyville
New Construction, Infrastructure - 105,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Shelbyville, TN 37160

Site Preparation/Excavation
Post-Bid
Cleveland, TN 37311

Laurel Branch Park Site Preparation and Sewer Extension
Infrastructure
Post-Bid
Maryville, TN 37801

WWTP Sludge Thickening/Dewatering and UV Disinfection Facilities
Renovation, Infrastructure
Results
$8,000,000 est. value
Louisville, TN 37777

Lanier School Wastewater Treatment Facility Upgrade - 2021
Renovation
Results
Maryville, TN 37801

Meineke Car Care Centers
New Construction, Infrastructure
Pending Verification
$1,800,000 CJ est. value
Shelbyville, TN 37160

Oak Ridge General Aviation Airport
New Construction, Infrastructure
Pending Verification
$54,413,000 CJ est. value
Oak Ridge, TN 37830

Storyville Gardens Phase 1
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Nashville, TN 37219

Basin - J Sewer Outfall Rehabilitation
Infrastructure
Bidding
$550,000 CJ est. value
Newport, TN 37821

Herman Street Mixed-Use
New Construction, Infrastructure - 2,000 SF
Post-Bid
$100,000,000 CJ est. value
Nashville, TN 37208

Rockfall Mitigation on U.S. 19E (S.R. 37) at L.M. 8.7
Infrastructure
Results
TN

Last Updated 12/21/2022 09:02 AM
Project Title

Water Treatment Plant Filter Renovation

Physical Address View project details and contacts
City, State (County) Chapel Hill, TN 37034   (Marshall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $518,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved is in one (1) contract and consists of the following generally described work: Renovation of existing Filters including Media Replacement, New Control Valves, and Control Panel New Variable Frequency Drives for High Service Pumps New Turbidimeters in Filter Building and Lab Building Miscellaneous Painting, Bolt Replacement, and Site Improvements. The allotted time for construction of Contract 20-01 is 90 calendar days; liquidated damages for non-completion are $500 per calendar day. All bidders must be licensed general contractors as required by the Contractors Licensing Act of 1976 of the General Assembly of the State of Tennessee and qualified for the type of construction being bid upon. Each bidder must deposit with his/her bid, security in the amount, form and subject to the conditions provided in the Instructions for Bidders. The successful bidder is required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. Each bidder shall be properly licensed and abide by the provisions of TCA 62-6-119 including part (b) which states in part: (b) The person or entity involved in the preparation of the invitation to bid or comparable bid documents, including any electronic bid documents, shall direct that the following information be written upon the bid envelope or provided within the electronic bid document: (1) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the prime contract; (2) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the masonry contract where the total cost of the materials and labor for the masonry portion of the construction project exceeds one hundred thousand dollars ($100,000); (3) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the electrical, plumbing, heating, ventilation, or air conditioning contracts except when such contractors portion of the construction project is less than twenty-five thousand dollars ($25,000); (4) For each vertical closed loop geothermal heating and cooling project, the company name, Tennessee Department of Environment and Conservation license number, classification (G, L or G,L) and the expiration date, except when the geothermal portion of the construction project is in an amount less than twenty-five thousand dollars ($25,000); (5) Prime contractor bidders who are to perform the masonry portion of the construction project which exceeds one hundred thousand dollars ($100,000), materials and labor, the electrical, plumbing, heating, ventilation or air conditioning or the geothermal heating and cooling must be so designated; and (6) Only one (1) contractor in each of the classifications listed above shall be written on the bid envelope or provided within the electronic bid document. The Owner reserves the right to reject any all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary. In compliance with TCA 12-4-126(a) and (b), the ENGINEER will not issue addenda less than forty-eight (48) hours before the bid opening date and time. Any questions concerning the bid documents shall be received by the ENGINEER before ninety-six (96) hours prior to the bid opening date and time. All bidders shall comply with all provisions of TCA 50-9-113 as it relates to Drug-Free Workplace requirements. The Contractor shall complete the Drug-Free Workplace Affidavit of the Prime Bidder form and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor(s) compliance with said law. All bidders shall comply with all provisions of Chapter 878 of TCA 12-4-1 as it relates to certification of compliance regarding illegal immigrants. The Contractor shall complete the Statement of Compliance Certificate Illegal Immigrants and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractors compliance with said law. All bidders shall comply with all provisions of Chapter 817 of TCA 12-12-106 as it relates to certification of compliance regarding the Iran Divestment Act. The Contractor shall complete the Statement of Compliance Certificate Iran Divestment Act and submit it with her/her bid. The Contractor shall be responsible for any of its Subcontractors compliance with said law.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents