Similar Projects
Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Bidding
ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Bidding
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Crabs, Upgrading Guardrail, Installing Underdrains, and Increasing Shoulder
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Mill and Plant Mix Inlay on SH-97 MP 86.9
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Mill and Inlay on I-90 From Wallace MP 63 to Mullan MP 68
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

SH-31, Overlay and Guardrail Upgrade
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
ID

Engineering Services for Design Of Worley Minor Streets Repair Phase 2
Infrastructure
Results
Worley, ID 83876

Capital Maintenance Phase Two
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Last Updated 09/15/2021 04:42 AM
Project Title

Placing an Overlay on SH-47 from MP 0.75 to MP 12.42

Physical Address View project details and contacts
City, State (County) ID   (Fremont County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the work of placing an overlay on SH-47 from MP 0.75 to MP 12.42; Ashton to Bear Gulch, known as Federal Aid Project No. A020(514), in Fremont County, Key No. 20514

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents