Similar Projects
Summit County Fairgrounds - Phase IA
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Coalville, UT 84017

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Quinns Water Treatment Plant and Signal Hill Area
New Construction, Infrastructure
Design
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

UDOT Wanship MS4 Project
Term Contract, Infrastructure
Results
Wanship, UT

SR-150 Sulphur to Bear River Service Preservation Low Volume
Infrastructure
Results
$1,500,000 est. value
UT

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

RFP - Highway 40 Corridor Spatial Study
Term Contract
Conception
Coalville, UT 84017

Summit County 2022 Overlay Project
Infrastructure
Post-Bid
$4,528,024 CJ est. value
Coalville, UT 84017

Franklin Spring Rehabilitation Project
Infrastructure
Results
$157,000 est. value
Henefer, UT

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

RFQ Engineering - Bitner Ranch Road to Silver Creek - Intersection Design
Infrastructure
Conception
$400,000 CJ est. value
Park City, UT 84060

Last Updated 04/14/2023 03:12 PM
Project Title

Silver Creek Connector Road

Physical Address View project details and contacts
City, State (County) Silver Summit, UT 84098   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work are approximately as follows: 36,842 Cu Yd Unclassified Excavation 20,770 Cu Yd Granular Borrow 20,480 Cu Yd UTBC 17,049 Ton HMA - 1/2 " 14,507 Sq Ft Flatwork, 6" Thick 8,723 Sq Ft Retaining Wall The Silver Creek to Bitner Connector road project has been in the works for some time. Summit County is excited to start this project. This project time period spans 2023 to 2024. It involves the reconstruction of road sections on Silver Creek and Bitner and the construction of a new connector road. See specs and plans for more information. The project is to be substantially complete by September 1, 2024. Liquidated Damages will be enforced at $2,430 per Working Day the project is not substantially complete. Questions regarding the proposal should be directed to John Angell at 435-336-3972 or jangell@summitcounty.org Each bidder must submit a bid bond from an approved surety company on forms provided by the Surety Company; or in lieu thereof, certified check, or cashiers check for not less than 5% of the total amount of the bid, made payable to Summit County as evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. Question Submission Close Date 4/10/2023 12:00 PM MDT The right to reject any or all bids is reserved Project Location: Silver Creek Road from approximately 7100 to 7300, Bitner Ranch Road from Bitner Ranch entrance to approximately 1.2 miles north. Summit County, UT. C. Schedule A is to construct a new roadway, approximately 2.5 miles (Connector Road) from Bitner Ranch Road to Silver Creek Road with a multi-use trail, a new roundabout at each end of Connector Road, a box culvert on Connector Rd, retaining walls and guardrail on Bitner Ranch Road, parking/bus stop area (Civic Center) with new mailbox housing structures, approximately 1.2 miles of roadway reconstruction on Bitner Ranch Road with a multi-use trail, and approximately 0.35 miles of roadway reconstruction on Silver Creek Road. D. Schedule B is to construct seven stamped concrete crosswalk pedestrian crossings, three raised crossings and four not raised. The crossings will include appropriate signage and pavement markings. It also includes the installation of a driver speed limit sign foundation in four locations, and installation of one driver feedback sign. E. Utah edition of the APWA Manual of Standard Specifications and Manual of Standard Plans 2017 edition and special provisions in the project manual apply on this project. For retaining walls and items where UDOT standard drawings are referenced, UDOT specifications will apply. For the mail house structural item, DFCM general conditions will apply. Where conflicts occur between APWA, DFCM and UDOT the most stringent will apply as determined by the OWNER or the ENGINEER. APWA general conditions will apply

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents