Similar Projects
Stair Replacement, Barre Falls Dam, Barre, MA
Term Contract
Design
Barre, MA 01005

Replace Protective Covering and Rigid Insulation at Foundation, Olde Village Place 667-1 & 705-1
Alteration
Bidding
$85,000 est. value
West Brookfield, MA 01585

Worcester Side Platform and Waterproofing
Alteration
Bidding
$3,200,000 est. value
Worcester, MA

Facade Improvements to Single-Story Commercial Building
Post-Bid
Clinton, MA 01510

Elmwood Front Entry Vestibule Reconfiguration and Reconstruction
Post-Bid
$35,000 est. value
Millbury, MA

Exterior Door Replacement
Results
$13,000 est. value
Baldwinville, MA 04136

Replacement of Exterior Doors
Results
$24,700 est. value
Blackstone, MA 01504

Gym Windows Installation
Alteration
Bidding
Douglas, MA 01516

Wachusett Dam Lower Gatehouse Window and Door Replacement - Filed Sub Bids
Post-Bid
$320,000 est. value
Clinton, MA

Butterick Building Window Replacement
Results
Less than $35,000 est. value
Sterling, MA 01564

Dupont Overhead Door Replacement Replace
Alteration
Bidding
$19,900 est. value
Fitchburg, MA

Accessible Transaction Counters with Cough - Protection Screens
Post-Bid
$55,000 est. value
Templeton, MA

Repair Cupola
Results
Less than $25,000 est. value
Sutton, MA 01590

Leominster Fire Station 3 - New Overhead Door
Alteration
Bidding
$14,000 est. value
Leominster, MA 01453

Shrewsbury High School Window Sill Repairs
Post-Bid
$126,000 est. value
Shrewsbury, MA 01545

Last Updated 03/10/2022 09:43 AM
Project Title

Phase 2 Sliding Door Replacement and Balcony Repairs

Physical Address View project details and contacts
City, State (County) Gardner, MA 01440   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Masonry, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $111,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior brick wall and balcony repairs and sliding door replacement at 116 Church Street Tower

Details

Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents