Similar Projects
Lateral Replacement and Trap/Vent Installation
Infrastructure, Alteration
Bidding
$150,000 est. value
Loysville, PA 17047

Heating, Ventilating, Air Conditioning and Refrigeration Equipment in Various Buildings
Term Contract
Bidding
Chester, Lima, Media, PA 19013

On-Call HVAC Services
Post-Bid
Pittsburgh, PA

DLA Distribution Susquehanna Air Compression System
Post-Bid
Mechanicsburg, PA 17055

Guaranteed Energy Savings Project
Results
Mill Hall, PA 17751

Construction of a New Warehouse - Heating and Ventilation Construction
Results
North East, PA 16428

HVAC Replacement
Alteration
Bidding
Levittown, PA 19055

Construction Project, CSS# 9773 - HVAC Repairs (PA206)
Post-Bid
$25,000 to $100,000 est. value
Willow Grove, PA 19090

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 2 - HVAC Construction
Results
$100,000 to $500,000 est. value
Reading, PA 19601

General Ancillary Services - HVAC Construction
Alteration
Bidding
PA

Gualtieri Portable A/C Units
Post-Bid
Pittsburgh, PA 15219

Split System Chiller and Pump Replacements at the Eyer Middle School
Results
Macungie, PA 18062

Tiger Pause/Eye of the Tiger HVAC Improvements
Post-Bid
Beaver, PA 15009

High School North Administration HVAC Replacement
Results
Newtown, PA 18940

Fastenal
Renovation
Post-Bid
$10,409 est. value
Cranberry, PA 16066

Last Updated 11/11/2021 03:20 PM
Project Title

SCI Waymart - Renovate Steam System

Physical Address View project details and contacts
City, State (County) Waymart, PA 18472   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,912,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to, evaluation and replacement of all piping, piping components, supports, and support components. Analyze of tunnel structure for repair of areas that are of weak or water in-filtrated. Provide options to eliminate the need for the steam header in the upper level of the boiler plant and reconfigure to distribute steam from the basement level of the boiler plant for steam service to the warehouse, welding shop, and boiler plant unit heaters. Pipe expansion analysis required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution, Heat Exchangers for HVAC, Steam-to-Steam Heat Exchangers, Central HVAC Equipment.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents