Similar Projects
DOVE Compliance Improvements
Post-Bid
Victor, CO

West Concrete Water Storage Tank
Post-Bid
Less than $2,250,000 est. value
Falcon, CO

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Middle Water Storage Tank Foundation Stabilization
Post-Bid
Less than $200,000 est. value
Clifton, CO 81520

Upper Water Storage Tank Rehabilitation Project
Results
Del Norte, CO

COANG Fuel Storage Tank
Post-Bid
Aurora, CO 80011

1 Million Gallon Water Storage Tank
Results
Less than $4,630,916 est. value
Steamboat Springs, CO 80477

Moraine Park Campground and HQ Utilities
Post-Bid
Grand Lake, CO

Liquid De-Icer Storage Tanks
Results
Arvada, CO 80002

Water Tank Cleaning and Inspection
Post-Bid
Canon City, CO

0.5 MG East Barclay Tank Rehabilitation Project
Results
Craig, CO 81625

Underground Storage Tank Repairs
Post-Bid
Denver, CO 80225

Widefield Terminal Tank Rehabilitation
Results
Colorado Springs, CO 80947

Water Treatment Process Tank and Apparatus Repair
Post-Bid
Arvada, CO

Last Updated 10/11/2021 12:21 PM
Project Title

Z--Bgndrf Glass Fused to Steel Storage Tanks Maintenance and Repairs

Physical Address View project details and contacts
City, State (County) State-Wide: CO
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Bureau of Reclamation, Upper Colorado Region, Brackish Groundwater National Desalination Research Facility (BGNDRF) has a requirement for performing maintenance and repair on three large, glass-fused to steel, water storage tanks. All tanks were built in 2004 and put in service shortly afterwards. The storage tanks are numbered 1 through 3 with storage tank 1 being the westernmost tank (50,000 gallons), storage tank 2 being the middle tank (100,000 gallons) and storage tank 3 being the easternmost tank (50,000 gallons).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents