Similar Projects
Last Updated | 11/11/2022 04:03 PM |
Project Title | Staples High School Partial Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Westport, CT 06880 (Fairfield County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | All Sub-Bids Received, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Staples High School Partial Roof Replacement A bid bond for five percent (5%) of the base bid cost is required, made payable to Westport Public Schools, and must accompany each proposal. Bids must be held firm for ninety (90) days beyond the bid opening date. The successful bidder must file a one hundred percent (100%) Performance Bond, a one hundred percent (100%) Labor & Materials Bond and a Certificate of Insurance with the Purchasing Agent within ten (10) days of notice of bid award. Attention of bidders is directed to certain requirements of this contract which require payment of minimum wages and compliance with certain local, state, and federal requirements. In accordance with Connecticut General Statute Sections 4a-100 and 4b-91, a responsible bid must contain two (2) documents: The Contractor Prequalification Certificate and the Update (Bid) Statement. The classification ROOFING is required as a minimum. This contract is subject to state contract compliance requirements, including non-discrimination statutes and setaside requirements. State law requires a minimum of twenty-five percent (25%) of the state-funded portion of the contract be set aside for award to subcontractors holding current certification as Small Business Enterprises (SBE) from the Connecticut Department of Administrative Services ("DAS"). A minimum of six and one-quarter percent (6.25%) of the state-funded portion must be set aside for subcontractors holding current DAS certification as Minority-, Women-, and/or Disabled-owned businesses (M/W/DisBE). The Contractor must demonstrate good faith effort to meet the twenty-five percent (25%) set-aside goals. The Westport BOE reserves the right to reject any and all bids or any part thereof, or to waive defects in same, or to accept any proposal, or part thereof, deemed to be in the best interest of the BOE for whatever reason. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |