Similar Projects
Hollenbachs Bridge
Demolition, New Construction, Infrastructure
Conception
$2,671,775 CJ est. value
Schnecksville, PA 18078

Hollenbachs Bridge
Demolition, New Construction, Infrastructure
Conception
$2,671,775 CJ est. value
Schnecksville, PA 18078

LVTS Urban ITS
Infrastructure
Design
$3,469,053 CJ est. value
Allentown, PA 18104

Kernsville Road Bridge
Infrastructure, Renovation
Design
$4,753,835 CJ est. value
Coplay, PA 18037

Lehigh Race Street Intersection
Infrastructure
Bidding
$10,000,000 CJ est. value
Allentown, PA 18109

Lehigh Race Street Intersection
Infrastructure
Bidding
$10,000,000 CJ est. value
Allentown, PA 18109

Major Bridge P3
New Construction
Post-Bid

Bridge Replacement
New Construction, Infrastructure
Post-Bid
PA

Mill Road Right Turn Lane Improvements Project
Infrastructure
Results
Breinigsville, PA 18106

2021 Street Maintenance Project
Infrastructure
Results
$245,042 est. value
Center Valley, PA

Whitehall-Coplay School District New Elementary School - General
New Construction, Infrastructure - 95,835 SF
Construction
$22,424,000 CJ est. value
Whitehall, PA 18052

Maulfair Drive Drainage Improvements Project
Infrastructure
Construction
$395,899 CJ est. value
Salisbury Township, PA 18103

Penn Square Section 6
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Allentown, PA 18103

Penn Square Section 6
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Allentown, PA 18103

Limeport Pike over Saucon
Infrastructure
Conception
$3,490,250 CJ est. value
Coopersburg, PA 18036

Last Updated 01/03/2023 07:34 AM
Project Title

Powder Valley Road over Indian Creek

Physical Address View project details and contacts
City, State (County) Zionsville, PA 18092   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $993,950 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR 2025 (Powder Valley Rd) over Indian Creek Upper Milford Twp Lehigh County Primary Improvement Type: Replace/Rehab As of January 03, 2023, the project is in development stage. Anticipated letting date is March 30, 2023. PennDOT - Powder Valley Road over Indian Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents