Similar Projects
Saint Louis Zoo WildCare Park Conservation and Safari Barn Shells
New Construction, Infrastructure
Design
$300,000 CJ est. value
Saint Louis, MO 63138

Demolition Work for New Administration Building
Demolition, Infrastructure
Design
$600,000 CJ est. value
Saint Louis, MO 63103

Whetstone Creek CA - Big Lake Spillway Structure Replacement
Infrastructure
Bidding
$450,000 CJ est. value
Williamsburg, MO 63388

Demolition and Clean-up of Six (6) Structures
Demolition, Infrastructure
Bidding
$50,000 CJ est. value
Cape Girardeau, MO 63701

Tree Planting and Forestry Services
Term Contract
Sub-Bidding
West Alton, MO 63386

Health Department Renovation
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Pineville, MO 64856

Gotsch Intermediate School - Asbestos Abatement Service
Alteration
Post-Bid
Affton, MO 63123

Environmental Remediation Services
Term Contract
Post-Bid
Kirkwood, MO

Asbestos Removal
Alteration
Results
Joplin, MO 64804

Former Jamestown Mall - Environmental Abatement
Alteration
Results
Florissant, MO 63034

RFQ - Environmental Consulting Services
Term Contract
Bidding
Saint Louis, MO 63103

Snow Removal Services
Term Contract
Sub-Bidding
Hillsboro, MO 63050

Asbestos Abatement for Moreau Heights Elementary School and Thorpe Gordon Elementary School
Alteration
Post-Bid
Jefferson City, MO 65101

Asbestos Removal at old bank building
Alteration
Results
Poplar Bluff, MO

Former Jamestown Mall Demolition
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Florissant, MO 63034

Last Updated 06/02/2023 08:46 AM
Project Title

2023 Soffit Repair for Central High School

Physical Address View project details and contacts
City, State (County) Springfield, MO 65802   (Greene County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All work must take place outside of Owner-occupied hours. This site has summer school. Work may take place May 26-June 4, July 1-July 4, July 22-August 11. The Work shall be Substantially Complete by August 11, 2023. Final Completion shall be September 8, 2023. Provide all labor and materials to repair and paint south west entrance soffit. Remove corbels and any necessary moldings in a manner which preserves as much of the original materials as possible. Replace soffit panel with 1/8” Aluminum composite ACM panel. Apply one coat Sherwin Williams Kem Bond HS primer and two coats Sherwin Williams Water Based Alkyd Urethane, color matched to existing. Install flashing vertically behind guttering, which encloses the fascia, and then terminates a minimum of 1” after horizontal return. Reinstall corbels and moldings to match original profile. Coat all surfaces from the uppermost face of guttering down to the molding underneath the corbels with one coat Sherwin Williams Kem Bond HS primer and two coats Sherwin Williams Water Based Alkyd Urethane, color matched to existing. End result shall be visually identical to existing conditions in order to preserve historic design and continuity to other similar entrances.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents