Similar Projects
TIFID Pump Station Filters
Term Contract
Sub-Bidding
Butte, MT 59701

2021-2022 Weatherization Program
Alteration
Post-Bid

2021-2022 Weatherization Program
Alteration
Post-Bid

Valves Upgrade
Term Contract
Results
$100,000 to $250,000 est. value
Fort Harrison, MT 59636

2023 Wastewater System Improvements
Renovation, Infrastructure
Results
$1,141,828 CJ est. value
Roy, MT 59471

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Water System Improvements
New Construction, Infrastructure
Results
$1,058,316 CJ est. value
Havre, MT 59501

On-call Plumbing/Sewer and Drain Services
Term Contract
Post-Bid
Billings, MT 59103

Lower Rattlesnake PRV and Water Main Replacement
Infrastructure
Results
$179,909 CJ est. value
Potomac, MT 59823

Madison County Airport Public Water Supply Wells Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Ennis, MT 59729

South 2nd Street West & Cottonwood Street Water Main Replacement
Infrastructure
Post-Bid
$694,311 CJ est. value
Missoula, MT 59801

Last Updated 01/05/2023 12:33 AM
Project Title

31A Canal Chute Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Pablo, MT 59855   (Lake County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this Contract shall consist of furnishing tools, equipment, materials, supplies, manufactured articles, and furnishing all labor, transportation, and services, including essential communications, and performing all work or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the work in good faith shall be provided by the Contractor as through originally so indicated, at no increase in cost to the CO. Estimated cost range of project: From $400,000 to $600,000. The Contractor shall designate, in writing, a liaison officer who shall work with the Tribe's Indian Preference Coordinator in implementing the Indian Employment requirements under this contract. The Tribe's Indian Preference Coordinator may be contacted at the Tribal Complex, Highway 93, PO Box 278, Pablo MT 59855, telephone (406) 675-2700. CSKT 31 A Canal Rehabilitation. The scope of work for the project is to demolish and remove an existing concrete chute and install a new steel pipe, headworks structure, energy dissipation structure along the 31A irrigation canal. The project is located 5.3 miles northwest of the Confederated Salish and Kootenai Tribes - Tribal Headquarters in Pablo, MT on the Flathead Reservation. Bid open info - Mailed bids must be received at the CSKT Safety of Dams Office, 711 3rd Ave NW, Ronan, MT 59864 prior to the bid opening. Sealed bids will be publicly opened at the CSKT Safety of Dams Building -Conference Room located at 711 3rd Ave. NW, Ronan, Montana Pre-bid info - Failure by bidders to inspect the site will not relieve bidders from the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the contract documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents