Similar Projects
Sanitary Sewer System Improvements Contract A
Bidding
Tilton, IL 61833

Salt Storage, Generator and Sewer Connection Phase 2 (General)
New Construction
Bidding
Less than $500,000 est. value
Carrollton, Hamel, Jerseyville, IL

Catch Basin and Inlet Cleaning 2020-2021
Term Contract
Post-Bid
Mount Prospect, IL 60056

Public Works Materials-2020
Term Contract
Post-Bid
Rockford, IL 61104

Manhole Cleaning
Results
Palos Park, IL 60464

2020 Manhole Rehabilitation
Results
$337,726 to $359,476 est. value
Elk Grove Village, IL 60007

West Woodlawn Sewer Improvement
Bidding
Chicago, IL 60637

Sewer Root Control Treatment
Term Contract
Post-Bid
Saint Charles, IL 60174

2020 Sanitary Sewer Inspection and Rehabilitation
Results
Oak Lawn, IL 60453

East Garfield Park Sewer Improvement
Bidding
Chicago, IL

Phase II Sanitary Sewer Cleaning Televising
Post-Bid
Poplar Grove, IL 61065

Main Street Sewer Extensions
Results
$300,000 est. value
Pecatonica, IL 61063

2021 Sanitary Transmission Sewer Lining Program
Bidding
Lake Zurich, IL

Sewer Cleaning and Inspection, Project 8
Post-Bid
Peoria, IL 61600

Circle Avenue Sewer Separation Improvements
Results
Less than $4,000,000 est. value
Forest Park, IL 60130

Last Updated 03/11/2021 12:25 PM
Project Title

Sanitary Sewer Rehabilitation - Phase I

Physical Address View project details and contacts
City, State (County) Mascoutah, IL   (Saint Clair County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, equipment, material, supplies, permits and fees required for the rehabilitation of various sizes of sanitary sewer mains via CIPP lining, open-cut repair and CIPP point repair methods, removal and replacement of approximately 314 linear feet of 10-inch vitrified clay sanitary sewer gravity main by the open-cut trench and jacking and boring method, installation of four standard sanitary sewer manholes, removal and replacement of an existing sanitary sewer manhole, rehabilitation of approximately twenty-two lateral to main connections via open-cut repair method.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents