Similar Projects
Spring 2019, Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
Fairfax, VA 22035

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Tusico Branch Stream Restoration
Results
Fairfax, VA

Herndon Metrorail Intermodal Access Improvements Project
New Construction
Post-Bid
Herndon, VA

Piney Branch Stream Restoration - Construction
Results
Less than $1,600,000 est. value
Vienna, VA 22160

Spring 2021 Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Reston Metro Center Walkway
Alteration
Post-Bid
Reston, VA 20191

Concrete Pipe
Term Contract
Results

On-Call Emergency Soil Repair
Term Contract
Results

Multiple Stream Restoration Projects
Results
$2,000,000 to $4,000,000 est. value
VA

Scotts Run Stream Restoration Phase 2
Results
VA

Accotink Creek At Wakefield Park Stream Restoration Project
Results
Less than $1,047,854 est. value
Fairfax, VA 22035

Pohick Stream Valley Trail Hillside to Burke Station
Results
Less than $690,000 est. value
Fairfax, VA 22035

Last Updated 09/22/2021 11:28 AM
Project Title

Rabbit Branch at Collingham Drive

Physical Address View project details and contacts
City, State (County) VA   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,262,738
Plans Available from County Agency - 08/18/21
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of restoration of approximately 5,000 LF of the stream Rabbit Branch of Pohick Creek watershed in the Braddock District, including the main stem and 13 tributaries. The work includes the following: grading, excavation, fill, stream realignment, in-stream rock and log structures, reinforced stream bed, wetland and riparian corridor enhancement, non-native invasive management, and restoration of disturbed areas with native species/landscaping. Natural Channel Design (NCD) standards have been incorporated into the restoration design. Construction stakeout is the Contractor’s responsibility.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents