Similar Projects
NE 153 Street Roadway and Drainage Improvements
Infrastructure
Bidding
$460,000 est. value
North Miami Beach, FL 33162

NE 153 Street Roadway and Drainage Improvements
Infrastructure
Bidding
$460,000 est. value
North Miami Beach, FL 33162

Traffic Circle Improvements at SW 97 Avenue and SW 120 Street
Post-Bid
Less than $401,933 est. value
Miami, FL 33128

Emergency Culvert Replacement at NW 57 Avenue and NW 186 Street - Tropical Storm ETA
Post-Bid
Less than $206,557 est. value
FL

Drainage Improvements C-100 Canal Outfalls Retrofit Between SW 98 Ave. and SW 106 Ct.
Results
Less than $693,814 est. value
Miami, FL

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Madeleine Village Apartments Seawall Replacement
Results
Less than $530,000 est. value
Miami Beach, FL 33139

Charles Deering Estate Courtyard Drainage and Structural Improvement
Post-Bid
Miami, FL 33157

Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Results
$10,000,000 to $20,000,000 est. value
Miami, FL

Construction Services for a Roadway Improvement
Post-Bid
Miami Shores, FL 33150

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Results
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Push Button Intersection Improvements-North
Post-Bid
$1,583,934 est. value
FL

Drainage Improvements Multiple Sites
Results
Less than $573,862 est. value
Miami, FL 33128

Traffic Circle Improvements at SW 62 Avenue and SW 48 Street
Post-Bid
$318,000 est. value
Miami, FL 33134

Reported 05/17/2022 12:00 AM
Project Title

Cargo Yard Drainage Improvements Phase 1

Physical Address View project details and contacts
City, State (County) Miami Beach, FL 33139   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $1,481,600
Plans Available from Agency's Affiliate - 04/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of, but is not limited to, the following: Improvements to approximately 1,300 feet of roadway within the SFCT Cargo Yard including milling, resurfacing and overbuild of pavement, drainage, utility adjustments, pavement markings, and signage, and repair of existing facilities impacted by the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents