Similar Projects
AutoZone #6032 / Oak View
New Construction, Infrastructure - 6,000 SF
Design
$1,500,000 CJ est. value
Ventura, CA 93001

AutoZone #6032 / Oak View
New Construction, Infrastructure - 6,000 SF
Design
$1,500,000 CJ est. value
Ventura, CA 93001

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

California Waste Solutions Recycling Facility
New Construction - 170,765 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94607

2021 Pavement Rehabilitation
Alteration
Post-Bid
$500,000 est. value
Ross, CA 94957

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Van Nuys and Voss Mixed Use Development
New Construction, Infrastructure, Alteration - 86,550 SF
Design
Los Angeles, CA 91405

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Last Updated 08/31/2022 08:32 AM
Project Title

East Bay Municipal Utility District (EBMUD) Pardee Center Site Improvements

Physical Address View project details and contacts
City, State (County) Valley Springs, CA 95252   (Calaveras County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 31, 2022, bid received were rejected as they were over the budget. Project will rebid but no definite date yet.** It is the intent of these specifications, terms, and conditions to describe the site improvements that the District desires to have completed at its Pardee Center facility. 1. Overview of Site Improvements* a. Clearing and grubbing. b. Site demolition. c. Grading d. Drainage improvements. e. Concrete flatwork. f. Mechanical equipment screens. g. CMU retaining wall with foundation and stone veneer and cap. h. Relocation of existing boulders. i. Irrigation system improvements including testing, startup procedures, training, and maintenance during establishment period. j. Planter edgings k. Plantings, (trees, shrubs, ground cover, and sod), including soil testing and preparation, pre-emergent herbicide, plant establishment period and planting guarantee. l. Rock, Cobble, and Mulch. * The above list is only intended to provide a basic overview of the type of work that this project entails. It is not intended to be all inclusive. Proposers should review the plans and specifications, as well as the existing site conditions to determine the full scope of work that is required. East Bay Municipal Utility District (District) intends to award a contract to the Proposer(s) who best meets the Districts requirements. Contractor Question Deadline. July 27th, 2022 Addendum Issued (if necessary)August 2nd, 2022 Anticipated Contract Start Date October 4, 2022 Contract Duration: 160 Calendar Days Proposer, Proposers principal, or Proposers staff shall have been regularly engaged in the business of providing site improvements for at least three (3) years.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents