Similar Projects
Harvest Care Medical at Harrison Regional Industrial Park
New Construction - 50,000 SF
Conception
$3,900,000 est. value
Clarksburg, WV 26301

Tabler Station Logistics Park - Phase II
New Construction
Design
Martinsburg, WV 25402

Parkersburg - Williamstown
Alteration
Design
$3,000,000 est. value
Mineral Wells, WV 26150

Milling and Paving of Various Streets (CDBG Funded)
Infrastructure
Bidding
$700,000 est. value
Weirton, WV

Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Phase II - Storage Complex Feasibility
New Construction
Bidding
Morgantown, WV

Resurfacing City Streets
Post-Bid
Charleston, WV

New 8" Main including Road Boring
Infrastructure
Post-Bid
Harpers Ferry, WV

Catholic Farm - Becky's Creek
Results
WV

Elk Mountain Road
Results
WV 24954

Project Nova
New Construction - 204,982 SF
Pending Verification
Martinsburg, WV

Valley Storage - Inwood
New Construction - 93,600 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Inwood, WV

Beverly - Kings Run
Infrastructure
Design
$515,000 est. value
Mill Creek, WV 26280

Miscellaneous Construction - Holland Ave
Infrastructure
Bidding
Westover, WV 26501

WV Route 279 Improvement Plans
Alteration
Post-Bid
Bridgeport, WV 26330

CR 13 Willowwood Road
Results
Hinton, WV 25951

Reported 07/20/2022 12:00 AM
Project Title

Construct SRE Facility

Physical Address View project details and contacts
City, State (County) Lewisburg, WV 24901   (Greenbrier County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work may be generally described as, but is not limited to site work, over 3,000 SY of pavement and constructing a new Snow Removal Equipment Building.

Details

Airline/Passenger Terminal, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Door Hardware, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents