Similar Projects
Chip Seal. k-68; Ka 6374-01; Fr k-33/k-68 Jct e 1.027 Mi to Fr/Mi Co Ln in Fr Co. Ka 6375-01; Fr Fr/Mi Co Ln 12.40 Mi e to u-169/k-68 Jct In Mi Co. Length 13.414 Mi.
Infrastructure
Bidding

19th Street Reconstruction (Harper to O`Connell)
Infrastructure
Bidding
Lawrence, KS

N1200 Road Improvements
Infrastructure
Post-Bid
Eudora, KS 66025

Linear Grading, Reinforced Concrete Pipe, Subgrade Modification
Infrastructure, Alteration
Post-Bid
Eudora, KS 66025

Mill and Overlay
Results
$831,421 est. value
KS

Chip and Seal
Results
$535,242 est. value
KS

2021 Crack Seal Program
Infrastructure
Post-Bid
Lawrence, KS

2021 Milling, Patch, Overlay, and Concrete Maintenance Program - Phase 1
Results
Lawrence, KS

2021 Safe Routes to Schools Sidewalk Improvements
Infrastructure
Post-Bid
Lawrence, KS

2021 CDBG Street Restoration
Infrastructure
Results
Lawrence, KS

2021 Curb Inlet Top Replacement
Infrastructure
Post-Bid
Lawrence, KS

Lawrence Loop Bike Trail
Infrastructure
Results
Lawrence, KS

2021 Sidewalk Improvement Program
Infrastructure
Post-Bid
Lawrence, KS

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

9th Street Sidewalk Gap West of Iowa Street - 9th and Iowa Signal Replacement
Infrastructure
Post-Bid
Lawrence, KS

Last Updated 11/05/2021 05:01 PM
Project Title

Parking Lots and Roads

Physical Address View project details and contacts
City, State (County) Lawrence, KS   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes 5,450 SY of 2" Milling, 765 TON of 2" Asphalt Surface Course Overlay, 395 TON of Asphalt Patching, 1400 LF of 4" Solid White Painted Pavement Marking, and 3 EA of White Painted Accessibility Symbol.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents