Similar Projects
Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

Fairfield Inn / Scottsdale
New Construction, Infrastructure - 75,622 SF
Design
$33,000,000 CJ est. value
Scottsdale, AZ 85255

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Design
$150,000,000 CJ est. value
Goodyear, AZ 85338

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Site 20 New Reservoir Construction - Town of Gilbert
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Replacement Well Drilling
Infrastructure
Results
$5,500,716 CJ est. value
Mesa, AZ 85201

Z--Expedited Repair of 8-Inch Sewer Main Line
Term Contract
Results
Pinon, AZ 86520

Blue at Eastline Village
New Construction, Infrastructure - 190,546 SF
Construction
$43,000,000 CJ est. value
Tempe, AZ 85281

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Signal Butte Water Treatment Plant Expansion (SBWTP)
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Mesa, AZ 85212

Southern Avenue and Country Club Drive Intersection Improvements - City of Mesa
Infrastructure
Pending Verification
$27,148,555 CJ est. value
Mesa, AZ 85201

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Monterey Park Expansion
Infrastructure
Post-Bid
$5,729,645 CJ est. value
Mesa, AZ 85201

Last Updated 10/06/2023 09:40 AM
Project Title

Van Buren Relief Sewer Project - 48th Street to Loop 202

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85004   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,999,174 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Phoenix is seeking a qualified contractor to provide construction services for the project listed below. The proposed work includes installation of approximately 1,900 linear feet of new 15-inch sanitary sewer line just north of Van Buren Street from 50th Street to the Loop 202. The alignment begins at 50th Street near the Polk Street alignment, north on 50th Street to Taylor Street, east on Taylor Street to 51st Street, then south on 51st Street to Taylor Street, continuing east on Taylor Street, then south in an existing PUE along the west property line of parcel 125-05-029B to connect to the existing sewer just west of the Loop 202 and Polk Street alignment. The proposed 15-inch gravity sewer main will connect into the existing system and allow for removal or abandonment of some portions of the existing sewer lines. Work also includes installation of approximately 14 new sewer manholes. The Van Buren Relief sewer project (48th Street to Loop 202) will provide a new sewer that will mitigate surcharging flows experienced within the existing gravity sewer pipeline. At this meeting, staff will discuss the scope of work, general contract issues and respond to questions from the attendees. As City staff will not be available to respond to individual inquiries regarding the project scope outside of this pre-bid meeting, it is strongly recommended that interested firms send a representative to the pre-bid meeting. Questions pertaining to process or contract issues should be directed to Liz Blakley at (602) 495-3654 or elizabeth.blakley@phoenix.gov. The City reserves the right to award the contract to the lowest responsible responsive bidder or all bids will be rejected, as soon as practicable after the date of opening bids. The City of Phoenix will provide reasonable accommodations for alternate formats of the bid packet by calling Liz Blakley at (602) 495-3654 or calling TTY 711. Requests will only be honored if made within the first week of the advertising period. Please allow a minimum of seven calendar days for production Work will be completed within 180 calendar days, beginning with the day following the starting date specified in the Notice to Proceed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents