Similar Projects
Harrison High School Food Court Serving Line Renovations
Renovation
Post-Bid
Kennesaw, GA 30152

Macon County Middle School Hvac Modifications
Post-Bid
Montezuma, GA 31063

(ESPLOST) Woodville-Tompkins Gym Construction and Auditorium Renovation
New Construction, Renovation
Results
Less than $11,386,000 est. value
Savannah, GA 31404

Amana Academy Charter School
Results
Alpharetta, GA 30009

General Contractor Services - Coralwood Diagnostic Center Additions and Renovations
Renovation, Addition
Construction
Less than $5,600,000 est. value
Tucker, GA

Roswell High School Renovation and Additions
Renovation, Addition
Construction
Less than $8,625,000 est. value
Roswell, GA 30075

Loganville High School Locker Room Building
New Construction - 1,728 SF
Post-Bid
Less than $750,000 est. value
Loganville, GA 30052

Cafeteria Addition, Tech Lab Mod- Lakeside M.S.
Renovation, Addition - 1,750 SF
Results
Cumming, GA 30041

Gifted Academy Gym Renovations and Modifications
Renovation
Construction
Less than $1,850,000 est. value
Dublin, GA 31040

Richmond Hill High School Replacement
New Construction - 516,369 SF
Post-Bid
Richmond Hill, GA

Kell High School Auditorium Seating Replacement
Results
Less than $158,650 est. value
Marietta, GA 30066

Richmond Hill Middle School Additions
Renovation, Addition - 21,459 SF
Construction
Richmond Hill, GA 31324

Roof HVAC Electrical and Bathroom Renovation to Southeast High School
Renovation
Post-Bid
Dalton, GA 30721

Disaster Recovery Services
Results

Group B Security Vestibules
Renovation
Post-Bid
Atlanta, Decatur, Doraville, Dunwoody, Stone Mountain, Tucker, GA 30319

Last Updated 06/22/2021 08:29 AM
Project Title

Walton High School Robotics Lab

Physical Address View project details and contacts
City, State (County) Marietta, GA 30062   (Cobb County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $195,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of converting an existing Auxiliary Gymnasium into a Robotics Lab.

Details

Middle/Senior High School, New Construction.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents