Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Task Order Pavement Construction for DTR, DIAAH, DCA and IAD
Term Contract
Post-Bid
Dulles, VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Post-Bid
$110,000 to $180,000 est. value

Northstar Boulevard from: Route 50 to: 0.18 Miles South of Shreveport Drive
Results
$63,000,000 est. value
VA

2020 Plant Mix
Results
Less than $5,024,000 est. value
VA

2020 Plant Mix
Results
Less than $2,689,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 Plant Mix
Results
Less than $4,114,000 est. value
VA

2020 Plant Mix
Results
Less than $3,687,000 est. value
VA

Street Milling and Resurfacing
Results
Purcellville, VA 20132

Rural Rustic Roads Renewable Contract
Results
Less than $3,750,000 est. value
VA

Nursery Avenue Roadway and Drainage Improvements
Results
Purcellville, VA

Water Activated Cold Patch
Term Contract
Results

John Mosby Highway and Elk Lick Road Median Closure
Results
Leesburg, VA 20175

Dulles Transit Center Renovation
Renovation
Results
VA

Last Updated 06/24/2021 09:32 AM
Project Title

Northstar Boulevard Phase II

Physical Address View project details and contacts
City, State (County) VA   (Loudoun County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a VDOT Local Administered Project (LAP) that consists of the extension of NorthStar Boulevard from the intersection of Tall Cedars Parkway north approximately 3,500 linear feet, connecting to Route 50 (John Mosby Highway). The improvements will consist of two northbound and two southbound lanes; associated turn lanes at the intersections of Tall Cedars Parkway, Marrwood Drive and Route 50; and a 40-foot-wide depressed grass median. The project requires substantial improvements on John Mosby Highway - Route 50 to accommodate turn lanes for the new intersection with NorthStar Boulevard. The improvements consist of approximately 3,500 linear feet of widening on Route 50. The project will also include but is not limited to: • 152’ Single Span Bridge over the South Fork of Broad Run • Storm Sewer & Drainage • Level 1 Retention Pond • Level 1 Bioretention Basin • 4’x10’ Box Culvert • Watermain and Sanitary Sewer • 10’ multi-use trails on both sides of NorthStar Blvd. • Three Signalized Intersections (Tall Cedars Pkwy, Marrwood Dr., and Route 50) • Multi-Phased Traffic Management Plan • Utility Coordination as required

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents